Loading...
HomeMy WebLinkAboutLetter - 3/10/1997 r ~, '!' Brinkman Apartments PO Box 1265 Oshkosh, WI 54902 March 10, 1997 Re: Frontenac Apartments Dear Mr. & Mrs. Brinkman; On Wednesday, March 5, 1997, we received renewed complaints regarding roof leaks and falling ceiling plaster in the apartment at 309D Brown St. Because this was a reoccurring situation and in this case involved a substantial amount of fallen plaster that we perceived as being a health threat, we.responded with an immediate inspection. After making this inspection, I phoned your office to set up a joint inspection and relayed what this inspection revealed. The joint inspection was conducted Thursday afternoon, March 6. As you are aware, it was our determination due to the amount of water infiltration and the possibility that additional plaster may still be subject to dislodging, this dwelling unit was posted as being uninhabitable. During our joint inspection on Thursday, we indicated to Mr. Brinkman that we would allow occupancy of this unit once the ceiling, wall and kitchen floor surfaces were repaired/replaced to acceptable Minimum Housing Code Standards. We also indicated the front and rear dwelling unit doors must be replaced (please make an assessment on the condition of the door frames as they may also be in need of replacement or repair) and the electrical wiring in the ceiling must be checked by a licensed contractor to determine if it has been damaged by water from roof leaks. Once, the unit has been repaired, we will reinspect and upon finding corrected conditions will allow occupancy. This procedure will allow you additional time, if needed, in which to make necessary window repairs. As you know, we have sent you correspondence twice in the past few months develop an acceptable schedule for making all of the needed repairs noted last September. While this office works diligently to follow the procedures established, you may find it difficult to make all of the repairs as required by the attached Correction Notice by the dates set by those very procedures. In these types of cases, it is our policy to allow owners to propose a schedule for making those repairs. In reviewing this type of proposal we look for signs of good faith efforts toward making the noted corrections. For example, in this case, we would want to see written documentation that a contractor has been hired to replace/repair the roofing. Once a schedule has been accepted, we would conduct periodic inspections to verify it is being followed. The use of a schedule, when correction time frames cannotbe met is the only option we have used to grant extensions. r- ~ .. Without such a schedule, if Correction Notice time frames are not met, our procedures will require additional enforcement action to be pursued. We would prefer not to use such action, believing that voluntary compliance obtains better results and promotes positive attitudes from both the owner of the property and from the inspectors. Once you have reviewed the Correction Notice, take time to review and compare it with your maintenance/repair plan. You will most likely find that most, if not all, of the items are already on your maintenance list for this building. Develop a schedule, listing the items slated for repair and the dates to start and complete, then set up an appointment to review this schedule with us. If you have any questions while developing this schedule, please call me at 236-5045. I would like to receive a preliminary schedule by Monday, March 24, 1997. By this date, we should also set up a meeting to discuss this schedule and any concerns you have. Sincerely; Allyn Dannhoff Director of Inspection Services Bruce Luedtke Housing Inspector