HomeMy WebLinkAbout0127080-Plumbing (bathroom)
e CITY OF OSHKOSH No 127080
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1636 MENOMINEE DR Owner MARY E CUTLER Create Date 10103/2007
Contractor SOPER PLUMBING
Shower
Water Softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
Floor Drain
2
1
Lndry Tray
Disposal
Dishwasher
Category 410 - Residential-Interior
Plan
Wait. St.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Shamp Sink
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
, Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature Fixture replacement in bathrooms.
of Work
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
I
Valuation
Issued By
Size
Sanitary Sewer
Storm Sewer
Water Service
Material
Type
#
Conn. Type
$2,500.00
Plan Approval
$0.00
Parcelld #
1512730000
Permit Fees
$28.00 0 Permit Voided I'
Date 10103/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Address 2225 BURNWOOD DR
Agent/Owner
OSHKOSH
Date
WI 54902 - 9003 Telephone Number 426-2151
To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.