Loading...
HomeMy WebLinkAbout0127079-Plumbing (water heater) CITY OF OSHKOSH No 127079 e OSHKOSH ON THE WATER Job Address 2035 HICKORY LN PLUMBING PERMIT - APPLICATION AND RECORD Owner WILLIAM R SMERZ LIFE ESTATE Create Date 10/03/2007 Plan Contractor SAMMONS PLUMBING Category 411 - Residential-Water Heaters Bathtub Shower Water Softner Wait. St. Whirlpool Floor Drain Local Waste Ice Chest Lavatory Lndry Tray Clothes Wshr Exam Sink Toilet Disposal Bidet Sculry Sink Res. Sink Dishwasher Beer Tap Hand Sink Bar Sink Sump Pump Lab Sink Plaster Sink Water Heater Classrm Sink Sterilizer Surgeons Sink Site Drain Breakrm Sink Dip Well F Prep Sink Roof Drain Ejector/Grind Drink Ftn Serv Sink Misc. Fixtures Use/Nature SFR / Replace gas water heater. **DEBIT ACCT**. of Work Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs i Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Valuation $600.00 Plan Approval ~ $0.00 $25.00 0 Permit Voided I Parcelld # 1526160000 Permit Fees Issued By Date 10/03/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner . Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.