Loading...
HomeMy WebLinkAbout2007-Building (roof) o OSHKOSH ON THE WATER Job Address 444 N SAWYER ST CITY OFOSHKOSH No 127054 BUILDING PERMIT - APPLICATION AND RECORD Owner ASSOCIATED BANK NA TL ASSOC Create Date 09/17/2007 Designer Contractor ED CHASE CO INC Category 223 - Alteration Offices, Banks, Professional Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Canopies Finished/Living Sq.Ft. Bedrooms Stories Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature Barik: T'Reroof-tcaroffe,(isting layers, install new roofing system. * See attached e-mail descrjjJ,iori-onh'ercofing~sysferri~-- of Work HV AC Contractor Plumbing Contractor $0.00 Permit Fee Paid $523.00 Park Dedication $0.00 Issued By: '/0 Date 10/0212007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1608850100 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 5001 GREEN VALLEY RD OSHKOSH WI 54904 - 0000 Telephone Number 235-5220 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. Pag~ 1 of2 Dannhoff, Allyn J. From: Terry Buss [tbuss@edchase.com] Sent: Monday, September 17, 2007 1 :22 PM To: Oannhoff, Allyn J. Subject: Re: G. P. / Assocaited Bank Allyn, We had some miscommunication on Associated Bank and I thought that we had obtained a permit for the roofing work. This is not the case. The existing construction is poured in place concrete with a small wing (the drivethrough area) metal. The proposal calls for removal of exisitng materials down to the deck. Above the metal we are fastening 1/2 inch dens deck prime (Type X Gyp), prior to applying any other roofing. Above the Gypsum and concrete we are applying a twp ply type IV fiberglass vapor barrier (which also serves as the temporary roof.) This is glazed with asphalt. We are then applying ATLAS tapered polyisocyanurate insulation, and 1/2 inch wood fiberboard set in type III asphalt. The roof system is Certainteed four ply fiberglass built up roof, modified bituminous flashings, and gravel surface. Muza will be installing a 24 gauge metal coping cap per 1-29 requirements into wood blocking also fastened per FM 1-29. The roof is specified by ROS consulting. RoofNAV # is17806-4849-0 Price is $145,000. Is this enough info to get a permit with? If so could you fax it at your convenience and we will promptly pay for it. Please call with any questions that you may have. Thanks 9/20/2007