HomeMy WebLinkAbout0126971-Building (fence)
-0 ~
OSHKOSH
ON THE WATER
Job Address 1829 SHERIDAN ST
CITY OF OSHKOSH No 126971
BUILDING PERMIT - APPLICATION AND RECORD
Owner MICHAEL D/ANGELA L HAHN Create Date 09/21/2007
Designer
Contractor THE LANDSCAPE COMPANY
Category
251 - Fences Plan
Type
o Building
o Sign
o Canopy
. Fence
o Raze
Zoning
Class of Const:
Size
Sq.Ft.
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
D Projection I
Unfi nished/Basement
Canopies
Finished/Living
Bedrooms
Stories
Garage
Baths
Signs
Foundation
o Poured Concrete 0 Floating Slab
o Concrete Block . Post
o Pier
o Treated Wood
o Other
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature ~FR/ Install 6' tall wood privacy fencing to enclose"side and rear yards. * Note: Fencing in area of planned retaining wall shall not exceed-'
of Work !6' in height measured from the base of the retaining wall at the property line.
Plumbing Contractor
HV AC Contractor
Electric Contractor
Fees: Valuation
$5,500.00 Plan Approval
$0.00 Permit Fee Paid
$60.00 Park Dedication
$0.00
Issued By:
Date 09/27/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1217080000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit applic iOI1 within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secu "a y n ce~ary approvals before starting such activity.
j
Signature I Date
Agent/Owner
Address 708 NICOLET AVE
OSHKOSH
WI 54901 - 0000 Telephone Number 920-236-9400
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
Qo :";"-'~
auo4d ~PP&E.ttG
P!~:U~ qog
SS8JPP\f
aWBN