Loading...
HomeMy WebLinkAbout0126944-Plumbing (water heater) o OSHKOSH ON THE WATER Job Address 925-927 OREGON ST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner 923 OREGON LLC Contractor MOREMAN PLBG & HTG SERVICE INC Category 441 - Industrial-Water Heaters Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Water Softner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest FlrlWst Sink Lndry Tray Clothes Wshr Exam Sink Catch Basin Disposal Bidet Sculry Sink Wash Ftn Dishwasher Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp No 126944 Create Date 09/25/2007 Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs r,:;--'--~--- --- -.- --.....----.---.---..-.----.. - ----..-.-...---~----_.~..----.--.-----~.-----.- .--------..- rOMM (#925) J R,p"'" "~,oj", """ h,,'e, 00 20d flooc ," dooc '" 'h, "gh1. E',,,,,,,, ',"'"e1oc "k",wo, "DEB'T ACCT", I I I Valuation Issued By Size Material Type # Conn. Type $600.00 Plan Approval ___~___$O.OO Permit Fees ~ _325.00 D Pe::mityoided I Parcelld # 0900820000 Address PO BOX 1325 Agent/Owner OSHKOSH WI 54903 - 1325 Telephone Number (9?0) 231-9191 Sanitary Sewer Storm Sewer Water Service Date 09/25/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.