Loading...
HomeMy WebLinkAbout0126933-Building (roof) e OSHKOSH ON THE WATER Job Address 1430 MENOMINEE DR CITY OF OSHKOSH No 126933 BUILDING PERMIT - APPLICATION AND RECORD Owner PETER B/NANCY M WORLAND Create Date 09/25/2007 Designer Contractor DR FIX IT Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size U nfin ished/Basement Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Signs Garage Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature ~FR / ADD 1 LAYER OF ROOFING TO THE EXISTING 1 LAYER ON THE HOUSE AND ATTACHED GARAGE, NO STRUCTURAL of Work ~HANGES HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $6,000.00 Plan Approval Issued By: ~):5; ----- $0.00 Permit Fee Paid $60.00 Park Dedication $0.00 Date 09/25/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1513030000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to sec~re". necessary approv,a;,s bJlore st ingp,\Jch activity. Signature ~. I ,/!.,; '/ Date t, ;l'7"'~ ) Agent/Owner Address 5701 COUNTY ROAD BB APPLETON WI 54914 - 9001 Telephone Number (920) 739-5014 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.