HomeMy WebLinkAbout0126933-Building (roof)
e
OSHKOSH
ON THE WATER
Job Address 1430 MENOMINEE DR
CITY OF OSHKOSH No 126933
BUILDING PERMIT - APPLICATION AND RECORD
Owner PETER B/NANCY M WORLAND Create Date 09/25/2007
Designer
Contractor DR FIX IT
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
U nfin ished/Basement
Sq.Ft.
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies
Signs
Garage
Baths
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature ~FR / ADD 1 LAYER OF ROOFING TO THE EXISTING 1 LAYER ON THE HOUSE AND ATTACHED GARAGE, NO STRUCTURAL
of Work ~HANGES
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation $6,000.00 Plan Approval
Issued By: ~):5;
-----
$0.00 Permit Fee Paid
$60.00 Park Dedication
$0.00
Date 09/25/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1513030000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to sec~re". necessary approv,a;,s bJlore st ingp,\Jch activity.
Signature ~. I ,/!.,; '/ Date t, ;l'7"'~ )
Agent/Owner
Address 5701 COUNTY ROAD BB
APPLETON
WI 54914 - 9001 Telephone Number (920) 739-5014
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.