Loading...
HomeMy WebLinkAboutLetter-Ahern (Fire Protection System Installation) J. F. AHERN CO. MECHANICAL & FIRE PROTECTION CONTRACTORS 201 Morris Court, P.O. Box 1316 Fond du Lac, WI 54936-1316 (920) 921-9020 p. (920) 921-8666 f www.jfahern.com September 12, 2007 Building Inspector -- Brian N oe City of Oshkosh 215 Church Avenue -- PO Box 1130 Oshkosh, VVI 54901 T -920/236-5051 F-920/236-1130 RE: FIRE PROTECTION SYSTEM INST ALLA TION HUNTERS RIDGE CONDOMINIUMS BUILDING #9 3190 WHITE TAIL LANE OSHKOSH, WISCONSIN 54904 AHERN FIRE PROTECTION PROJECT No. 995253 Dear Brian: RE IV SEP 1 3 2007 DEPARTMENT OF COMMUNITY DEVELOPMENT INSPECTION SERVICES DIVISION Enclosed is a copy of the Contractor's Material and Test Certificates covering the above-referenced Fire Protection System Installation for your files. Very truly yours, AHERN FIRE PROTECTION A division of J. F. Ahem Co. ~!R$~ Mark L. Jozefowski, Superintendent MLJlksj Enclosure LCITY09-12-2007.DOC2 Building the Midwest Since 1880 An Equal Opportunity Employer AHERN FIRE PROTECTION Contractor's Material and Test Certificate for Aboveground Piping PROCEDURE Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative. . All defects shall be corrected and system left in service before contractor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and contractor. It is understood the owner's representative's signature in no way prejudices any claim against contractor for faulty material, poor workmanship, or failure to comply with approving authoritv's requirements or local ordinances. PROPERTY NAME Hunters Ridge Condominiums AFP W.O. #: 995253 I DATE: April 3, 2007 PROPERTY ADDRESS 3190 White Tail Lane ~~~I J:~MA m,.. . ACCEPTED BY APPROVING AUTHORITIES (NAMES) . n I: I V~ 1. Oshkosh Fire Department (Battalion Chief -- Stu Schrottky) .,:, " 2. City of Oshkosh (Building Inspector -- Brian Noe) SEP I 3 2007 3. 4. ,..."'. DEPARTMENT OF ADDRESS -V"W'UI'o!l I r UcVELOPMENT Plans 1. 101 Court Street - Oshkosh, WI 54901 INSPECTION SERVICES DIVISIOri 2. 215 Church Avenue -- PO Box 1130 -- Oshkosh, WI 54901 3. 4. . INSTALLATION CONFORMS TO ACCEPTED PLANS i;ES DNO EQUIPMENT USED IS APPROVED YES DNO IF NO, EXPLAIN DEVIATIONS t " HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION {S[ YES DNO OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT? INSTRUCTIONS IF NO, EXPLAIN HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES: Item No.'s 2& 3 will 1. SYSTEM COMPONENTS INSTRUCTION YES DNO be folWarded by AFP at closeout time. 2. CARE AND MAINTENANCE INSTRUCTIONS ~~S DNO 3. NFPA 25 ES DNO LOCATION OF SUPPLIES BUILDINGS SYSTEM Building #9 MAKE MODEL YEAR OF K- QUANTITY TEMPERATURE MANUFACTURE FACTOR RATING Central LFII TY2234 Pendent 1/2" White 2007 4.9 54 155 Dea, SPRINKLERS PIPE AND TYPE OF PIPE CPVC FITTINGS TYPE OF FITTINGS CPVC FLOW ALARM DEVICE MAXIMUM TIME TO OPERATE THROUGH TEST CONNECTION . TYPE MAKE MODEL MIN. SEC. Water Flow Detector System Sensor WFD 7_'1 N/A EXPLAIN ANY ALARM PROBLEMS: ALARM DEVICES . LOW AIR ALARM DEVICE ALARM OPERATED ~E I MAKE MODEL PRESSURE PROPERLY l N/A) SETTING PSI I YES NO -- I EXPLAIN ANY ALARM PROBLEMS; Ahern Fire Protection CENTRAL MONITORING SIGNALS RECEIVED ALARM SERVICE LOCATION(S) TYPE OR PRESSURE NAME OF REMOTE WATERFLOW SWITCH LOW-AIR OTHER SERVICE DETECTOR FLOW SUPERVISORY SUPERVISING LOCATION(S): STATION (ON-SITE) REMOTE REMOTE NAME OF SERVICE: MONITORING ALARM SERVICE SIGNALING (OFF-SITE) PHONE: ~V~ OTHER: LOCATION(S): EXPLAIN ANY ALARM SIGNALING PROBLEMS: DRY VALVE Q.O.D. MAKE MODEL SERIAL NO. MAKE MODEL SERIAL NO. ~'V: TIME WATER ALARM TIME TO TRIP WATER TRIP POINT AIR THROUGH TEST AIR PRESSURE REACHED TEST OPERATED CONNECTION,,2 PRESSURE PRESSURE OUTLET '.2 PROPERLY DRY PIPE MIN. SEC. PSI PSI PSI MIN. SEC. YES NO OPERATING WITHOUT TEST Q.O.O. WITH Q.O.o. IF NO, EXPLAIN: ~~ OPERATION: o PNEUMATIC 0 ELECTRIC o HYDRAULIC . PIPING SUPERVISED DYES ONO DETECTING MEDIA SUPERVISED DYES ONO DOES VALVE OPERATE FROM THE MANUAL TRIP, REMOTE, OR BOTH CONTROL STATIONS DYES ONO IS THERE AN ACCESSIBLE FACILITY IN EACH IF NO, EXPLAIN DELUGE & CIRCUIT FOR TESTING PREACTION DYES ONO VALVES DOES EACH CIRCUIT DOES EACH CIRCUIT MAXIMUM TIME TO OPERATE SUPERVISION OPERATE VALVE RELEASE OPERATE RELEASE MAKE MODEL LOSS ALARM YES NO YES NO MIN. SEC. ~\' LOCATION & MAKE & MODEL SETTING STATIC PRESSURE RESIDUAL PRESSURE FLOW RATE FLOOR (FLOWING) PRESSURE " INLET OUTLET INLET OUTLET FLOW REDUCING VALVE TEST " (PSI) (PSI) (PSI) (PSI) (GPM) 1 MEASURED FROM TIME INSPECTORS TEST CONNECTlbN IS OPENED. 2 NFPA 13 ONLY REQUIRES THE 60-SECONO LIMITATION IN SPECIFIC SECTIONS. 2 TEST DESCRIPTION TESTS BLANK TESTING GASKETS WELDING CUTOUTS (DISCS) HYDRAULIC DATA NAMEPLATE REMARKS Ahern Fire Protection ROSTA TIC' Hydrostatic tests shall be made at not less than 200 psi (13.6 bars) for two hours or 50 psi (3.4 bars) above static pressure in excess 0 .150 psi (10.2 bars) for two hours. Differential dry-pipe valve clappers shall be left open during test to prevent damage. All aboveground piping leakage shall be stopped. PNEUMATIC: Establish 40-psi (2.7 bars) air pressure and measure drop, which shall not exceed 1-1/2 psi (0.1 bars) in 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not exceed 1-1/2 pSi (0.1 bars) in 24 hours. ALLPIPING HYDROSTATICALLY TESTED AT PSI '-Bar) for_ HRS. IF NO, STATE REASON DRY PIPING PNEUMATICALLY TESTED &/'/\ 0 YES 0 NO EQUIPMENT OPERATES PROPERLY ,..l" 0 YES 0 NO DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE CHEMICALS, SODIUM SILICATE OR DERIVATIVES OR SODIUM SILICATE, BRINE, OR OTHER CORROSIVE CHEMICALS WERE NOT USED ~9R TESTING SYSTEMS OR STOPPING LEAKS? BI YES 0 NO DRAIN READING OF GAUGE LOCATED NEAR WATER RESIDUAL PRESSURE WITH VALVE IN TEST TEST SUPPLY TEST CONNECTION~ PSI ( Bar) CONNECTION OPEN WIDE: '::IS- PSI LBar) UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISER OTHER EXPLAIN FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING. VERIFIED BY COpy OF THE CONTRACTOR'S MATERIAL AND TEST ~ CERTIFICATE FOR UNDERGROUND PIPING. 0 YES 0 NO FLUSHED BY INSTALLER OF UNDERGROUND SPRINKLER PIPING 0(YES 0 NO IF POWDER-DRIVEN FASTENERS ARE USED IN CONCRETE, HAS REPRESENTATIVE SAMPLE TESTING BEEN SATISFACTORILY COMPLETED? N~ OYESO NO NUMB~USED LOCATIONS WELDED PIPING 0 YES NO IF NO, EXPLAIN NUMBER REMOVED IF YES... DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS B2.1? DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS 0 YES QUALIFIED IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS 82.1? DYES ONO ONO DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A DOCUMENTED QUALITY CONTROL PROCEDURE TO ENSURE THAT ALL DISCS ARE RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND OTHER WELDING RESIDUE ARE REMOVED, AND THAT THE INTERNAL DIAMETERS OF PIPING ARE NOT PENETRATED? DYES ONO DO YOU CERTIFY THAT YOU HAVE A CON CUTOUTS (DISCS) ARE RETRIEVED? NAME PLA1E.,PROVIDED aYES 0 NO ROL FEATURE TO ENSURE THAT ALL DYES 0 NO IF NO, EXPLAIN DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN: NAME OF SPRINKLER CONTRACTOR AHERN FIRE PROTECTION, 201 MORRIS COURT':" FOND DU LAC, WI 54935 TESTS WITNESSED BY ISDICTlON (SIGNED) >:./;HL, /I Flit €.. GNED) ;.....-) -01 ~THQ..RITJES SIGNATURES ~~ FOR PROPERTY OWNE t::!tl 8 TITLE DATE q-tl~6 DATE DATJ= '1'-'f/~ 3