Loading...
HomeMy WebLinkAbout0126778-Building o OSHKOSH ON THE WATER Job Address 42 MILL ST CITY OF OSHKOSH No 126778 BUILDING PERMIT - APPLICATION AND RECORD Owner MOUAlBAO LOR Create Date 09/14/2007 Designer Contractor FOUST EXCAVATING Category 161 - Wrecking Residential Dwellings Plan Type o Building o Sign o Canopy o Fence . Raze Zoning Class of Const: Size Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Unfinished/Basement FinishedlLiving Bedrooms Stories 2 Canopies Garage Baths Signs Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier . Other o Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units # Structures UselNatureRaze and Remove Single Family House and Garage. 2 story house, single stall garage. of Work HV AC Contractor Plumbing Contractor Electric Contractor $6,300.00 Plan Approval $0.00 Permit Fee Paid $67.00 Park Dedication $0.00 Issued By: Date 09/14/2007 FinaIIO.P. 00/00/0000 D Permit Voided I Parcel Id # 0806110000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature ~ --;:;?~ Date ~( (t./-/"<3? Address 2824 CLAIRVILLE RD AgentlOwner OSHKOSH WI 54904 - 9151 Telephone Number (920) 426-5808 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.