Loading...
HomeMy WebLinkAbout0126791-Building e OSHKOSH ON THE WATER Job Address 2777 MINERVA ST CITY OF OSHKOSH No 126791 BUILDING PERMIT - APPLICATION AND RECORD Owner Q~WEY HOMES Create Date 09/10/2007 Designer Contractor DEWEY HOMES INC Category 11.Q--=-J'Iew Single Family Plan 038-0907 Type . Building o Sign o Canopy o Fence o Raze ~ Zoning R-2 Class of Const: 8 Size Unfinished/Basement ~ Sq. Ft. Rooms Height 14 Ft. D Projection I FinishedlLiving ~ Sq.Ft. ~ Sq.Ft. Bedrooms 6 3 2 Stories Canopies Signs Garage Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Required Occupancy Fee $0.00 Flood Plain No Height Permit Not Req~i!ed # Structures Park Dedication Require~ # Dwelling Units ~_1 UselNature of Work ~ ---------------------.--. .__.__._---------------_._-----~---- INSFR/ New single family* 1 story with 2 car attached garage and 12' x 12' patio. Lm.... Plumbing Contractor P&S PLUMBING HV AC Contractor AMERICAN HEATING & A C CO Electric Contractor CUMINGS ELECTRIC INC Fees: Valuation $91,900.00 Plan Approval Issued By: ~6 $75.00 Permit Fee Paid $409.00 Park Dedication $200.00 -------- Date 09/14/2007 FinaIlO.P. ~0/00/0009_ D Permit Voided I Parcelld # 1230120000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) a".~./~~c arvpprovals before starting such activity. S\gnature ", -~ /.----- Date ? -/ V-e;:, 1 Agent/Owner OSHKOSH WI 54901 - 2230 Telephone Number 920-231-3389 Address To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. 101/ .... () (l) t..\Co' - .,g i"4 2./ \lbY.S-e... \1 }. \1. Po..", D ~ '-.} . '-.!. 1"/ . "i-cl," OJ .... ~.t." \I' tjC\fo..~e. 'l\.j' " ~ Lo,*- \\1. '2111 M\V\et\{(}... S\. e OSHKOSH ON THE WATER Job Address 2777 MINERVA ST PARKLAND DEDICATION FEE COLLECTION RECORD Date 09/14/2007 -----_.----- Name DEWEY HOMES Address Oshkosh WI 54901 Subdivision Lot 112 Building Permit Number 0126791 Number of Dwelling Units Number of Structures Fee Required $209.00 owner'sSignatu~~ Inspector's Signature T Fee Paid Date 7 - I Y ~" ., Date G OSHKOSH ON THE WATER GRADE STAKE FORM Grade Stake Number 7458 Name DEWEY HOMES Address 2777 MINERVA ST Create Date 09/10/2007 Lot 112 Block Ward Subdivision Zone Street Number 2nd add't Rusch & Kienast Lot Dimensions U_lI~~wal~_~~sI0g -1 Building Grade Elevation Stakes Set At Site 09/10/2007 Set By Department of Public Works I, the undersigned, owner or agent of the above described property agree to have the grade established before excavation has commenced. a.v~ ~ / Wisconsin Department of Industry, Labor and Human Relations Safety and Buildings Division P.O. Box 2509 Madison, WI 53701-2509 Wisconsin Statues 101.63, 101.73 WISCONSIN UNIFORM BUILDING PERMIT APPLlCA TION Application No. 0126791 Parcel No. D Constr D HVAC DElee Mailing Address D Plbg o Erosion D Other: Telephone No. Oshkosh WI 54901 - 0000 Plbg Lic/Cert # 250178 Plbg Lic/Cert # 170792 Plbg Lic/Cert # 6356 Plbg Lic/Cert # Mailing Address 1941 BEECH ST Mailing Address PO BOX 749 Mailing Address 1129 MICHIGAN AVE Mailing Address PO BOX 2153 OSHKOSH NEENAH Telephone No. WI 54901 - 2230 920-231-3389 Telephone No. WI 54957 - 749 920-231-5946 Telephone No. WI 54902 _ 6437 235-8090 Telephone No. WI 54912 - 2153 920-722-5035,9 ,T N,R E(or)W Block No. OSHKOSH APPLETON S . ft. Subdivision Name 1/4, 1/4,Section Lot No. 112 Left ~ Forced Air Furnace D Radiant Baseboard or Panel D Heat Pump D Boiler D Central Air Conditioning Other Living Area 1127 _._-~ 1127 -- 528 Sewer o Municipal D Septic Permit No. Nat. L.P. Oil Elec. Solid Gas Space Htg 0 D D D WaterHtg 0 D D C D Dwelling unit will have 3 kilowatt or more installed electric space heating equip. Infiltration control option is: D Full sealing of joints. D Blower door test. D Exterior air infiltration barrier. D Seasonal o Permanent 0 Municipal Utility o Plus Basement D Other D Private On-Site Well The applicant agrees to comply with all applicable codes, statues and ordinances and with the conditions of this permit, understands that the issuance of the permit creates no legal liability, expr plied, 0 he Department or municipality; and certifies that all the above information is accurate. APPLICANT'S SIGNATU ~ DATE SIGNED r - / '7'-07 This permit' . sued pursuant to the following conditions. Failure to comply may result in suspension or APPROVAL CONDITIONS revocatio this permit or other penalty SEE "STANDARD CONDITIONS OF APPRO AL" SHEET Garage D Village 0 City D County D State of: City Of Oshkosh Municipality Number of Dwelling Location: 7 0 2 6 Inspection Wis. Permit Seal Other Total SBD-5823 (R. 07/92) $30.00 ~ Construction D HVAC D Electrical D Plumbing o Erosion D Name JOHN ZARATE Date 9/10/2007 $105.00 352319 Cert. No. 70330 All habitable rooms must be provided with 8% light and 3.5% ventilation. Bedrooms located on the second floor or below ground level must be provided with egress windows in addition to the light arid veritilation requirements. Basement windows are also required to have window well areas in accord~ce with COMM 21.03. Garage spaces shall be separated from the dwelling unit in accordance with COMM 21.08. Thedoor and frame assembly between the dwelling unit and an attached garage shall be labeled by an independent testing agency as having a minimum fire-resistive rating of 20 rmnutes.AlI drywall joints are required tobe taped/sealed unless the joints are fitted so that the gap is no more than a dimes thickness ( 1720::'mch) and backed by solid wood or drywall with the joints staggered. All penetrations in exteri~r walls must be sealed prior to the insulation inspection. This includes holes in the top and bottom plates, slits and holes in electrical boxes, gaps around neating ducts, and holes in the return air spaces. 5. Hydromassage tubs are required to have an access panel to the motor. . must be accessible without removing the finish of the house. ," :,-, _',"0" '",,'. ',' ,->' " , '. i",_ ' ,;.'; __, . The truss manuf~cturermust design all overframing, according to standards set by the . truss plate institute, or structural calculations must be provided prior to the rough building inspection. Truss plans must be submitted and approved prior to framing the roof. Truss plans including thetruss layout must be provided on site at the rough building inspection. In addition to the truss plans, microlam calculations must be provided on site at the rough building inspection for all microlams with point loads on them~ The property owner and applicant is responsible for compliance with COMM 21.125 (Erosion Control). Wheninstalling access drives, a minimum of2"-3" diameter stone is required in add.ition to a minimum of 6" depth, 30'-50' length, and 14'-20' width. Erosion control meas:ures must be maintained until the lawn is established. i " All storm sewer inlets must be protectedwith. approved erosion controldevices. Tracking (i.e. sediment) must be removed from the street at the end of each workday. "Repair any siltation or erosion damage to adjoining surfaces and'drainageways resulting from land developmenfor disturbing activities. " The building placard must be posted on site atalltimes. Once the rough framing is up the placard must he posted" on thepati() door or on a kitchen window . Tfthe placard is not present at any inspection, stop work orders will be posted. Additionalplacards can be obtained through. our department if the cards are misplaced. All mechaniG~ls must berough.ed in prior to requesting the rough. building inspection. ." If on the inspe~tion the mechaiiicals are not roughed in, the inspection will fail and a" $100 re-inspection fee will be charged. 14. Attached is a copy of the fmal inspection checklist. At the final inspection all items on this list mus(be completed to avoidth.e $100 re':inspection fee per inspection. "_10 "'.i I _, _', . 15. Appliances such as tHe stove, refrigerator, washer, and dryer are not to be set in place due to the electricalinsPl:?ctor needing to look at the power serving the appliances: 16. A 6' stepladder mustbe on site at the final inspection to provide access to the attic. ; " , " . " When requesHngfinal inspections please note that a minimum of 2 days notice is needed fr.o. m.. tho e tim....e. '.". the insp. e.ct. ion. is ready. At the final inspection no. furnitUre 0" r personal I belongings are allowed in the dwelling.. If occupancy is required prior to the completion ofthehollse ~e applicant/owner is required to submit an application for a Temporary Occupancy Peimit along with the required fees. A Temporary Occupancy may be approved proVided that all health arid safety issues are complete and approved. The building placard must remain outhe patio door or on a kitchen window until occupancyisipproved: Occupancyis not allowed prior to the placard having all of the final inspection approved stickers on the backside.' If occupancy occurs prior to the inspections being approved daily citations will be issued With no further notice being given. All site grading must be done in accordance with the approved drainage plan on file in the public works office, 3rd. floor. Si~ture of Awli~~ Date: /~/'i~7 ."