Loading...
HomeMy WebLinkAbout0126754-Plumbing e OSHKOSH ON THE WATER Job Address 504 KNAPP ST CITY OF OSHKOSH PLUMBING PERMIT. APPLICATION AND RECORD Owner 504 KNAPP STREET LLC Contractor KIENAST L G UTILITY CONSTRUCTION Category 401 - Residential-Exterior (laterals) Bathtub Shower Water Softner Wait. St. Shamp Sink Whirlpool Floor Drain Local Waste Ice Chest Flr/Wst Sink Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Toilet Disposal Bidet Sculry Sink Wash Ftn Res. Sink Dishwasher Beer Tap Hand Sink Urinal Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature Abandon sewer and water at ROW to raze structure. of Work No 126754 Create Date 09/13/2007 Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Size "\ Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Valuation $500.00 $0.00 $25.00 D Permit Voided I Parcelld # 0604380100 Permit Fees Plan Approval Issued By Date 09/13/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and 0 sec e any ne sary approvals before starting such activity. J Signature J' Da~ 'YJJr--o/ Address 765 N WASHBURN OSHKOSH WI 54904 - 0000 Telephone Number 414-231-0898 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.