Loading...
HomeMy WebLinkAbout0126756-Plumbing CITY OF OSHKOSH No 126756 . OSHKOSH ON THE WATER Job Address 506 KNAPP ST PLUMBING PERMIT - APPLICATION AND RECORD Owner 506 KNAPP STREET LLC Create Date 09/13/2007 Plan Category 401 - Residential-Exterior (laterals) Contractor L G KIENAST UTILITY Shower Water Softner Wait. St. Floor Drain Local Waste Ice Chest Lndry Tray Clothes Wshr Exam Sink Disposal Bidet Sculry Sink Dishwasher Beer Tap Hand Sink Sump Pump Lab Sink Plaster Sink Classrm Sink Sterilizer Surgeons Sink Breakrm Sink Dip Well F Prep Sink Ejector/Grind Drink Ftn Serv Sink Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature ~bandon sewer and water at ROW to raze structure. of Work Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs i Valuation Material Type # Conn. Type $500.00 Plan Approval $0.00 Permit Fees Parcel Id # 0604380000 $25.00 0 Permit Voided I Date 09/13/2007 Issued By Size Sanitary Sewer Storm Sewer Water Service In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the "",mon' hold.'(') Z4re a4"",,\;O' appre~" 'l"fom "'""9 s",h a"M\y. Signature t?' "' r ~ A / Agent/Owner Date 3-} /( I (j Address 765 N WASHBURN OSHKOSH WI 54904 - 7721 Telephone Number 920-231-0898 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.