HomeMy WebLinkAbout0126756-Plumbing
CITY OF OSHKOSH No 126756
.
OSHKOSH
ON THE WATER
Job Address 506 KNAPP ST
PLUMBING PERMIT - APPLICATION AND RECORD
Owner 506 KNAPP STREET LLC Create Date 09/13/2007
Plan
Category 401 - Residential-Exterior (laterals)
Contractor L G KIENAST UTILITY
Shower Water Softner Wait. St.
Floor Drain Local Waste Ice Chest
Lndry Tray Clothes Wshr Exam Sink
Disposal Bidet Sculry Sink
Dishwasher Beer Tap Hand Sink
Sump Pump Lab Sink Plaster Sink
Classrm Sink Sterilizer Surgeons Sink
Breakrm Sink Dip Well F Prep Sink
Ejector/Grind Drink Ftn Serv Sink
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature ~bandon sewer and water at ROW to raze structure.
of Work
Shamp Sink
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
i
Valuation
Material
Type
#
Conn. Type
$500.00
Plan Approval
$0.00
Permit Fees
Parcel Id #
0604380000
$25.00 0 Permit Voided I
Date 09/13/2007
Issued By
Size
Sanitary Sewer
Storm Sewer
Water Service
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
"",mon' hold.'(') Z4re a4"",,\;O' appre~" 'l"fom "'""9 s",h a"M\y.
Signature t?' "' r ~ A /
Agent/Owner
Date 3-} /( I (j
Address 765 N WASHBURN
OSHKOSH
WI 54904 - 7721 Telephone Number 920-231-0898
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.