Loading...
HomeMy WebLinkAbout0126712-Building (siding) o OSHKOSH ON THE WATER Job Address 227 MASON ST CITY OF OSHKOSH No 126712 BUILDING PERMIT - APPLICATION AND RECORD Owner BERNICE L SORENSON Create Date 09/12/2007 Designer Contractor CRAIG STAPEL Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Finished/Living Sq. Ft. Sq.Ft. Rooms Height Ft. o Projection I Unfinished/Basement Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation o Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood . Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o SFRI Remove existing' siding, install" 1" foam insulatiohn, wrap window/door casings with aluminum, instali vinyi siding, ai-UiliTilum offit/facia. Use/Nature of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees' ValUatiO~ $3,888.00 Plan Approval Issued By: f. . $0.00 Permit Fee Paid $46.00 Park Dedication $0.00 Date 09/12/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 0610150000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority tq enforce easement restrictions of which it is not a party, if you perform the work desalbed In thi~ 7l.It appll,a'on withIn an easement, the CIty ,trongly "go, the pennlt applleant '" oootaot the ea"ment holder(s) and to('!;.:e a~y necessa provals b re starting such activity. I / ~ Signature Date'?!!; t?7 Agent/Owner Address 908 E PARKWAY AVE OSHKOSH WI 54901 - 0000 Telephone Number 232-1374 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.