HomeMy WebLinkAbout0126735-Building (Remodel dark room)
o
OSHKOSH
ON THE WATER
Job Address 1855 S KOELLER ST
CITY OF OSHKOSH No 126735
BUILDING PERMIT - APPLICATION AND RECORD
Owner OSHKOSH LASALLE 93 Create Date 09/12/2007
Designer
Contractor CR MEYER
Category
223 - Alteration Offices, Banks, Professional Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq.Ft.
Sq. Ft.
Sq.Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
o
# Structures
o
# Dwelling Units
Use/Nature
of Work
IOffice/ Remodel Dark Room Area - Eliminate wall & door betWeen dark room and Technician workstation and finish.
HV AC Contractor
Plumbing Contractor
Electric Contractor
$0.00 Permit Fee Paid
$81.00 Park Dedication
$0.00
Fees, valua~ $8,090,00
Issued By:
Plan Approval
Date 09/12/2007
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1307440601
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshk 0 authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this g mit applica on within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and t secure any cessary ap als before starting such activity.
Signature
Date
9-rz.-o",?
Address
AgenUOwner
OSHKOSH
WI 54902 - 0000
Telephone Number
920-235-3350 x219
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.