Loading...
HomeMy WebLinkAbout0126666-Building o OSHKOSH ON THE WATER Job Address 600 N WESTHAVEN DR CITY OF OSHKOSH No 126666 BUILDING PERMIT - APPLICATION AND RECORD Designer Design II Owner WESTHAVEN OFFICES LLC Create Date 09/10/2007 Contractor NORTHCENTRAL CONSTRUCTION CORP. Category 223 - Alteration Offices, Banks, Professional Plan Z5-2087 -0907 Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: VB Size 4,449 sq ft Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Garage Sq.Ft. Sq. Ft. Bedrooms Stories Canopies Finished/Living Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Required Occupancy Fee $0.00 Flood Plain No Height Permit Not Required Use/Nature Interior alterations as pr State Transaction 10 # 1413538. of Work Not Required # Dwelling Units o # Structures o Park Dedication HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $ 0,000.00 Plan Approval $0.00 Permit Fee Paid $838.00 Park Dedication $0.00 Date 09/10/2007 Final/O.P. 00/00/0000 Issued By o Permit Voided I Parcelld # 1621650100 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. S;gnaMe ~~ ./ Agent/Owner -. Address 631 S HICKORY ST FOND OU LAC WI 54935 - 0000 Telephone Number 920-929-9400 Date f - ,Ie -0 7 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.