Loading...
HomeMy WebLinkAbout0126629-Building G OSHKOSH ON THE WATER Job Address 1535 HARRISON ST CITY OF OSHKOSH No 126629 BUILDING PERMIT - APPLICATION AND RECORD Owner DENNIS M GRUSE Create Date 09/06/2007 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Finished/Living Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Unfinished/Basement Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Use/Nature SFRllnstalling new kitchen cabinets (walls will not be opened) and installing 6 replacement windows (same size and location). of Work o # Structures o Park Dedication # Dwelling Units HV AC Contractor Plumbing Contractor UNKNOWN Electric Contractor UNKNOWN???? Fees: Valuation $2,500.00 Plan Approval Issued By: fu& $0.00 Permit Fee Paid $39.00 Park Dedication $0.00 Date 09/07/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1505790000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and t~cure any necessary approvals before starting such activity. S;gnotu<8 ~r t'~~ Date q -7 -07 Agent/Owner Address 1535 HARRISON ST OSHKOSH WI 54901 - 3007 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.