March 13,2007
Building Inspector -- Brian Noe
City of Oshkosh
215 Church Avenue
PO Box 1130
Oshkosh, VVI 54901
T -920/236-5051
F-920/236-1130
RE: FIRE PROTECTION SYSTEM INSTALLATION
AEROPOSTALE 3CC:>\ S WA.-~I-\'B\)~"\ 61
PRIME OUTLET MALL S~~ C D\O
OSHKOSH, WISCONSIN
AHERN FIRE PROTECTION PROJECT No. 994656
Dear Brian:
MAR 1 4 2007
Enclosed is a copy of the Contractor's Material and Test Certificates covering the above-referenced
Fire Protection System Installation for your files.
Very truly yours,
AHERN FIRE PROTECTION
A division of J. F. Ahem Co.
~!E$~
Mark L. Jozefowski, Superintendent
MLJ/ksj
LCITY03-13-2007.DOC
Building the Midwest Since 1880
An Equal Opportunity Employer
AHERN FIRE PROTECTION
Contractor's Material and Test Certificate for Aboveground Piping
PROCEDURE
Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative. All defects shall be
corrected and system left in service before contractor's personnel finally leave the job.
A certificaie shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and contractor. It is understood the
owner's representative's signature in no way prejudices any claim against contractor for faulty materilil, poor workmanship, or failure to comply with approving
authority's reQuirements or local ordinances.
PROPERTY NAME Aeropostale AFP W.O. #: 994656 I DATE: March 5, 2007
PROPERTY ADDRESS Prime Outlet Mall - 3001 South Washburn Oshkosh, WI 54904
ACCEPTED BY APPROVING AUTHORITIES (NAMES)
1. City of Oshkosh (Building Inspector - Brian Noe)
2. Oshkosh Fire Department (Battalion Chief -- Stu Schrottky) .
3.
4.
, ADDRESS
Plans 1. 215 Church Avenue -- PO Box 1130 - Oshkosh, WI 54901
2. 101 Court Street - Oshkosh, WI 54901
3.
4.
INSTALLATION CONFORMS TO ACCEPTED PLANS ~YES DNO
EQUIPMENT USED IS APPROVED r;tI YES DNO
IF NO, EXPLAIN DEVIATIONS
HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION III YES DNO
OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT?
INSTRUCTIONS IF NO, EXPLAIN
HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES:
Item No.'s 2 & 3 will 1. SYSTEM COMPONENTS INSTRUCTION I2tl YES DNO
be forwarded by AFP 2. CARE AND MAINTENANCE INSTRUCTIONS i2I YES DNO
at closeout time.
3. NFPA 25 ~YES DNO
LOCATION OF SUPPLIES BUILDINGS
SYSTEM Space C10 ----.,.-
MAKE MODEL YEAR OF K- QUANTITY TEMPERATURE
MANUFACTURE FACTOR RATING
Viking Micromatic VK102 Pendent 112" Chrome 2007 5.6 9 155 Deg.
Viking Micromatic VK100 Upright 112" Brass 2007 5.6 3 155 Deg.
SPRINKLERS
PIPE AND TYPE OF PIPE Thinwall Threadable: Black
FITTINGS TYPE OF FITTINGS Threaded: Mechanical Tees
FLOW ALARM DEVICE MAXIMUM TIME TO OPERATE
THROUGH TEST CONNECTION
TYPE MAKE MODEL MIN. SEC.
Existing Waterflow Switch //S/?-f! 0 4'2-
N/A
EXPLAIN ANY ALARM PROBLEMS:
ALARM
DEVICES LOW AIR ALARM DEVICE ALARM OPERATED
TYPE I MAKE I MODEL PRESSURE PROPERLY
SETTING PSI
N/A YES I NO
I
EXPLAIN ANY ALARM PROBLEMS:
CENTRAL MONITORING SIGNALS RECEIVED
ALARM SERVICE LOCATION(S}
TYPE OR PRESSURE
NAME OF REMOTE WATERFLOW SWITCH LOW-AIR OTHER
SERVICE DETECTOR FLOW SUPERVISORY
SUPERVISING LOCATION(S):
STATION
(ON-SITE)
REMOTE REMOTE NAME OF SERVICE:
MONITORING
ALARM SERVICE
SIGNALING (OFF-SITE)
PHONE:
OTHER: LOCATION(S):
EXPLAIN ANY ALARM SIGNALING PROBLEMS:
DRY VALVE O.O.D.
MAKE MODEL SERIAL NO. MAKE MODEL SERIAL NO.
TIME TO TRIP WATER TRIP POINT AIR TIME WATER ALARM
THROUGH TEST AIR PRESSURE REACHED TEST OPERATED
CONNECTION'" PRESSURE PRESSURE OUTLET 1.. PRO PERL Y
DRY PIPE MIN. SEC. PSI PSI PSI MIN. SEC. YES NO
OPERATING WITHOUT
TEST a.O.D.
WITH
a.O.D.
IF NO, EXPLAIN:
OPERATION: o PNEUMATIC o ELECTRIC o HYDRAULIC
PIPING SUPERVISED DYES DNO DETECTING MEDIA SUPERVISED DYES DNO
DOES VALVE OPERATE FROM THE MANUAL TRIP, REMOTE, OR BOTH CONTROL STATIONS DYES DNO
IS THERE AN ACCESSIBLE FACILITY IN EACH IF NO, EXPLAIN
DELUGE & CIRCUIT FOR TESTING
PREACTION DYES DNO
VALVES
DOES EACH CIRCUIT DOES EACH CIRCUIT MAXIMUM TIME TO
OPERATE SUPERVISION OPERATE VALVE RELEASE OPERATE RELEASE
MAKE MODEL LOSS ALARM
YES NO YES NO MIN. SEC.
LOCATION & MAKE & MODEL SETTING STATIC PRESSURE RESIDUAL PRESSURE FLOW RATE
FLOOR (FLOWING)
PRESSURE INLET OUTLET INLET OUTLET FLOW
REDUCING (PSI) (PSI) (PSI) (PSI) (GPM)
VALVE TEST
Ahern Fire Protection
1. MEASURED FROM TIME INSPECTORS TEST CONNECTION IS OPENED.
2 NFPA 13 ONLY REQUIRES THE 50-SECOND LIMITATION IN SPECIFIC SECTIONS.
2
TEST
DESCRIPTION
TESTS
BLANK
TESTING
GASKETS
WELDING
CUTOUTS
DISCS)
HYDRAULIC
DATA
NAMEPLATE
REMARKS
SIGNATURES
Ahern Fir~ Prot~ction
HYDROSTATIC: Hydrostatic tests shall be made at not less than 200 psi (13.6 bars) for two hours or 50 psi (3.4 bars) above static pressure in
excess of 150 psi (10.2 bars) for two hours. Differential dry-pipe valve clappers shall be left open during test to prevent damage. All
. aboveground piping leakage shall be stopped.
PNEUMATIC: Establish 40-psi (2.7 bars) air pressure and measure drop, which shall not exceed 1-1/2 psi (0.1 bars) in 24 hours. Test
pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not exceed 1-112 psi (0.1 bars) in 24 hours.
ALL PIPING HYDROSTATICALLY TESTED AT _ PSI <-Bar) for _ HRS. IF NO, .5TATE,FEASON
DRY PIPING PNEUMATICALLY TESTED DYES ONO W~~C.i>r.1 f'j1.e~->~i"e..
EQUIPMENT OPERATES PROPERLY 0 YES 0 NO -e.~ J
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITJVESAND CORROSIVE CHEMICALS, SODIUM
SILICATE OR DERIVATIVES OR SODIUM SILICATE, BRINE, OR OTHER CORROSIVE CHEMICALS WERE NOT USED
FOR TESTING SYSTEMS OR STOPPING LEAKS? .
,'YES 0 NO
DRAIN READING OF GAUGE LOCATED NEAR WATER RESIDUAL PRESSURE WITH VALVE IN TEST
TEST SUPPLY TEST CONNECTION:LL PSI ( Bar) CONNECTION OPEN WIDE: "<1 PSI LBar)
UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISER OTHER EXPLAIN
FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING.
VERIFIED BY COPY OF THE CONTRACTOR'S MATERIAL AND TEST ~)( t$ I; ~ 7
CERTIFICATE FOR UNDERGROUND PIPING. 0 YES 0 NO
FLUSHED BY INSTALLER OF UNDERGROUND SPRINKLER PIPING 0 YES 0 NO
IF POWDER-DRIVEN FASTENERS ARE USED IN CONCRETE, HAS IF NO, EXPLAIN
REPRESENTATIVE SAMPLE TESTING BEEN SATISFACTORILY COMPLETED?
DYES li(t NO
NUMBER USED
()
LOCATIONS
NUMBER REMOVED
WELDED PIPING
YES 0 NO
IF YES...
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING
PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS B2.1?
DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS
QUALIFIED IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS
DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A
DOCUMENTED QUALITY CONTROL PROCEDURE TO ENSURE THAT ALL DISCS
ARE RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND
OTHER WELDING RESIDUE ARE REMOVED, AND THAT THE INTERNAL
DIAMETERS OF PIPING ARE NOT PENETRATED?
DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL
CUTOUTS DISCS) ARE RETRIEVED?
NAME PLATE PROVIDED
BTYES 0 NO
DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN:
NAME OF SPRINKLER CONTRACTOR
AHERN FIRE PROTECTION, 201 MORRIS COURT - FOND DU LAC, WI 54935
TESTS WITNESSED BY
VING JURISDICTION (SIGNED) ./"'"TITLE
/"'\. Y
TITLE
3'
FOR SPRINKLER CONTRACTOR (SIGNED)
TITLE
3