Loading...
HomeMy WebLinkAbout2007-Building (doors/windows) o OSHKOSH ON THE WATER Job Address 1135 MARICOPA DR CITY OF OSHKOSH No 126615 BUILDING PERMIT - APPLICATION AND RECORD Owner PAUL J ANSFIELD Create Date 09/04/2007 Designer Contractor PORTSIDE BUILDERS, INC. Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Class of Const: Size Rooms Height Ft. o Projection I - Bedrooms Stories Canopies - Baths Signs Zoning U nfi nished/Basement Sq. Ft. Finished/Living Sq.Ft. Sq.Ft. Garage Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature FRI 4 exterior doors, windows on tne rear of the house and replace 2 rows on garage and 2nd level of back of the house. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $26,000.00 Plan Approval $0.00 Permit Fee Paid $166.00 Park Dedication $0.00 Issued By: Date 09/05/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1312750000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secur necessary apprID@!s before starting such activity. ,- "L~", 0 n Agent/Owner NEENAH q fe:- I", " Date ~ Signature Address 980 AMERICAN DR WI 54956 - 1363 Telephone Number 920-727-4874 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ~ i;,-__