Loading...
HomeMy WebLinkAbout0126614-Building (stairs) o OSHKOSH ON THE WATER Job Address 226 HIGH AVE CITY OF OSHKOSH No 126614 BUILDING PERMIT - APPLICATION AND RECORD Owner MERIL YN R SMITH Create Date 09/05/2007 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Sq.Ft. Sq.Ft. Rooms Height Ft. o Projection I Unfinished/Basement Finished/Living Canopies Bedrooms Stories Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature SFR/ Replace stairs* on the east side of the house. The owner states that the stairs will be rebuilt to the same existing appearance to of Work maintain the historical nature of the building. Plumbing Contractor HV AC Contractor Electric Contractor Fees: Valuation $1,300.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: 0Vf Date 09/05/2007 Final/C.P. 00/00/0000 o Permit Voided I Parcelld # 0101290000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secu!e any necessary approvals before starti g sUfh activity. Signature (/2 "- :4 <. ,"..., Date < /' /~7~ 7 Agent/Owner Address 226 HIGH AVE OSHKOSH WI 54901 - 4734 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.