HomeMy WebLinkAbout0126614-Building (stairs)
o
OSHKOSH
ON THE WATER
Job Address 226 HIGH AVE
CITY OF OSHKOSH No 126614
BUILDING PERMIT - APPLICATION AND RECORD
Owner MERIL YN R SMITH Create Date 09/05/2007
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
o Projection I
Unfinished/Basement
Finished/Living
Canopies
Bedrooms
Stories
Garage
Sq.Ft.
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit
Occupancy Fee
$0.00 Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature SFR/ Replace stairs* on the east side of the house. The owner states that the stairs will be rebuilt to the same existing appearance to
of Work maintain the historical nature of the building.
Plumbing Contractor
HV AC Contractor
Electric Contractor
Fees: Valuation
$1,300.00 Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Issued By:
0Vf
Date 09/05/2007
Final/C.P. 00/00/0000
o Permit Voided I
Parcelld # 0101290000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secu!e any necessary approvals before starti g sUfh activity.
Signature (/2 "- :4 <. ,"..., Date < /' /~7~ 7
Agent/Owner
Address 226 HIGH AVE
OSHKOSH
WI 54901 - 4734 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.