HomeMy WebLinkAbout2007-Building (basement egress window)
o
OSHKOSH
ON THE WATER
Job Address 1419 W 3RD AVE
CITY OF OSHKOSH No 126584
BUILDING PERMIT - APPLICATION AND RECORD
Owner EDWARD B/JANET A WEISSE Create Date 09/04/2007
Designer
Contractor
SURE-DRY-BASEMENT SYSTEMS INC
Category
140 - Interior Remodeling
Plan
Type
. Building
o Sign
o Canopy o Fence o Raze
Class of Const: Size
Rooms Height Ft. D Projection I
-
Bedrooms Stories Canopies
Baths Signs
Zoning
Unfinished/Basement
Sq.Ft.
Sq.Ft.
Sq.Ft.
Finished/Living
Garage
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature SFRtTnstalling a 48"x48" egress window in the basement. A code compliant header will be installed. This permit does -not include
of Work Inishing any portion of the basement.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: ~
$3,900.00 Plan Approval
$0.00 Permit Fee Paid
$46.00 Park Dedication
$0.00
Date 09/04/2007
FinaIlO.P. 00/00/0000
D Permit Voided I
Parcelld # 0610581300
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit ap~~ic:ation within eas~e~ffie City strongly urges the permit applicant to contact the easement
holder(s) and to seCU~~)lnY ne~ess ~a~pr~~!!i!l9 ~~C::h activity. 7 _ . . _
Signature ,/ _ .~ ~-----... Date?e r -v7
AgenUOwner
Address 754 W AIRPORT RD
MENASHA
WI 54952 - 1409 Telephone Number 920-967-9655
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.