Loading...
HomeMy WebLinkAboutPlumbing M1-4-190P -----:......-.;--,;-.'.,.~.-:-.-..-.~:.,----...--..:-.------:--' .-;---'..-...-:----:. ..~>_...-:.-~.'''_.. -..-.----r--..."-.--..~---:..-.--"--:...-..:-----:,::-,:.---.-.~---.:-;~.'" Jan., 16, 1990 David C. Frank 4660 Sandy Beach Ln. Oshkosh, WI 54901 RE: Plumbing Plan Approval for 139-141 High.Ave. IH1-4...190P Gentlemen: Examination of the plumbing plans and speoifications for the above mentioned projeot has been completed. . In acoord with Chapter 145, WiscODsin Statute, aDd ILHR 81 through 85, Wisconsin Administrative Code, the plumbing plans and specifioations are approved contingent upen compliance tdth the stipUlation noted below: 1 .P res sure balance shower valves arerequ ired. LHR 82.40 2. Water heater water supply shut off is required. ILHR 82.40 The archi tee t, pro fessiona 1 eng ineer, reg is tered d eslgner, owner or plumbing contractor shall keep, at the construction site, one set of plans bearing the stamp of approval. In the event installation of this plumbing system has not commenced within two years from this date, this approval shall become void. A new application accompani~d by full examination fee shall be filed and an updated approvat received before work may commenoe. In granting this approval, the City of Oshkosh, or its representative does not hold itself liab~e for any defects in plans or specification, plan omissions, examination oversight, construction or any damage that may result in or after installation and reserves the right to order changes or additions should conditions arise making this necessarbY, It shall be necessary for installing plumb~r to obtain a plumbing permit from the City of Oshkosh before p~oceeding with actual installation of this plumbing system or any.of its parts. Si:ncerely, RICHARD WOOD Plumbing 'Inspector R'Vl; mr