Loading...
HomeMy WebLinkAbout0126551-Building (front landing/stairs) o OSHKOSH ON THE WATER Job Address 45 FRANKFORT ST CITY OF OSHKOSH No 126551 BUILD.lNG PERMIT - APPLICATION AND RECORD Owner WAYNE C WOLFRATH Create Date 08/31/2007 Designer Contractor OWNER Category 142 - Decks, Patios, Ramps Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Finished/Living Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Unfinished/Basement Canopies Bedrooms Stories Garage Baths Signs Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block . Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature RES/ Replace front entrance landir:gaf1astaii~s.cApprox.:t5' p':ojectlOllfrom house x 6' parallel with house (to mirror projection of roof of Work bove.) HV AC Contractor Plumbing Contractor $500.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 Issued By: Date 08/31/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0805720000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to ~ec~re any necessary ap rovals before starting such activity. !p-3.3 - r cJc;<S /. Signature C:J, t!cX(!J" Date J?~ - tJ/ AgenUOwner Address 45 FRANKFORT ST OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.