HomeMy WebLinkAbout0126551-Building (front landing/stairs)
o
OSHKOSH
ON THE WATER
Job Address 45 FRANKFORT ST
CITY OF OSHKOSH No 126551
BUILD.lNG PERMIT - APPLICATION AND RECORD
Owner WAYNE C WOLFRATH Create Date 08/31/2007
Designer
Contractor OWNER
Category
142 - Decks, Patios, Ramps Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Finished/Living
Sq.Ft.
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
D Projection I
Unfinished/Basement
Canopies
Bedrooms
Stories
Garage
Baths
Signs
Foundation 0 Poured Concrete 0 Floating Slab
o Concrete Block . Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature RES/ Replace front entrance landir:gaf1astaii~s.cApprox.:t5' p':ojectlOllfrom house x 6' parallel with house (to mirror projection of roof
of Work bove.)
HV AC Contractor
Plumbing Contractor
$500.00 Plan Approval
$0.00 Permit Fee Paid
$25.00 Park Dedication
$0.00
Issued By:
Date 08/31/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0805720000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to ~ec~re any necessary ap rovals before starting such activity. !p-3.3 - r cJc;<S /.
Signature C:J, t!cX(!J" Date J?~ - tJ/
AgenUOwner
Address 45 FRANKFORT ST
OSHKOSH
WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.