Loading...
HomeMy WebLinkAboutSewer Survey & M E M 0 RAN DUM TO: Warren Renando, Dir. of Community Development FROM: Richard Wood, Plumbing Inspector DATE: April 6, 1983 SUBJECT: Sewer survey at 106 High Ave. On April ~, 1983, at the request of Mr~ Robert Yarbro, a survey was made of the sewer use at 106 High Ave. Dye water testing of the storm drain catch basin located at the rear entrance to 106 High Ave. showed that the discharge was to the sanitary sewer main located in the alley behind the building. Visual inspection of the interior roof leaders found a direct connection to the buildings sanitary drainage system discharging to the sanitary sewer main located on High Ave. cc: Mr. Robert Yarbro