HomeMy WebLinkAbout0126512-Building (stairway)
o
OSHKOSH
ON THE WATER
Job Address 1062 W 9TH AVE
CITY OF OSHKOSH No 126512
BUILDING PERMIT - APPLICATION AND RECORD
Owner CAROL A HARRINGTON Create Date 08/29/2007
Designer
Contractor OWNER
Category
140 - Interior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq. Ft.
Sq.Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Bedrooms
Stories
Canopies
Signs
Garage
Sq.Ft.
Baths
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature ~FR/ Finishing the stairway to the 2nd floor that was started back in 2000. All construction shall comply with minimum building code
of Work equirements. The owner was given the stairway handout as a reference.
Plumbing Contractor
HV AC Contractor
Electric Contractor
Fees: Valuation $1,000.00 Plan Approval
Issued By: SYYW ;
$0.00 Permit Fee Paid
$25.00 Park Dedication
$0.00
Date 08/29/2007
Final/O.P. 00/00/0000
o Permit Voided i
Parcelld # 0608450000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
h~lder(S) and to secure ? ne;e~ary ~pprovals before starting such activity.
S'goat,", ~~~ Oat. fs'-c2'i- 07
Agent/Owner
Address Oshkosh
WI 54901 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.