Loading...
HomeMy WebLinkAbout0126512-Building (stairway) o OSHKOSH ON THE WATER Job Address 1062 W 9TH AVE CITY OF OSHKOSH No 126512 BUILDING PERMIT - APPLICATION AND RECORD Owner CAROL A HARRINGTON Create Date 08/29/2007 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Sq.Ft. Rooms Height Ft. o Projection I Finished/Living Bedrooms Stories Canopies Signs Garage Sq.Ft. Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature ~FR/ Finishing the stairway to the 2nd floor that was started back in 2000. All construction shall comply with minimum building code of Work equirements. The owner was given the stairway handout as a reference. Plumbing Contractor HV AC Contractor Electric Contractor Fees: Valuation $1,000.00 Plan Approval Issued By: SYYW ; $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 Date 08/29/2007 Final/O.P. 00/00/0000 o Permit Voided i Parcelld # 0608450000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement h~lder(S) and to secure ? ne;e~ary ~pprovals before starting such activity. S'goat,", ~~~ Oat. fs'-c2'i- 07 Agent/Owner Address Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.