SAFETY AND aUILDIN ;:> DlVISIOt,;
:!Ol EastWashi; 'illllllP.\ler;ue
r !:I. Sre. 7%9
Madison. w.Jin : ~lns~n 53707
---
"'"
COnSIIJ
Oefjaftment of CommeiCe
,ommy G. ltlOffijjS, ii, Gm,-emor
\M!!!am J. McCoslv I '. Seereta!)'
September 6, 1996
Mr. James Goedderz
Enteia Inc.
3033 Madison Ave. SE
Grand Rapids r;,fi 49548
\3Bo
~<3l~\~
Dear Mr. Goedderz:
Thank you for your letter requesting approval of EuteIa Inc. as a recognized testiDI: .
iaboratory. Secretary Skormcka has asked that I reply onneI' behalf.
Based on the information that you provided. Ente1a Inc. is acceptable to the departr ",ent
as :it recognized testing lab under the provisions of s~ ILHR 16.11, Wisconsin Elect! deal
Code.
Approval is limited to standards for which recogmtionis extended as a Nationally
Recogni?ed Testing Laboratorj by the Occup:atio:md Safety and Health Admimstrat on's
program provided they do not conflict with Volume 2 of the Wisconsin Electrical (i)de.
I hope that the Infmmation in this letter satisfies YOUr immediate ne(:ds. Further
information on L;e Wisconsin Electrical Code or the recognition of laboratories um t~r
that code may be directed to Mr. Joe Hertel at (608) 266-5649. .
Sincerely,
I :;?_ a/
,,,.~~
Patrick J. Osborne
ExecuHve Assistant
S3D-SS3E-~ lR_Oryj9S)
II~l_ril"~
Benner. Kevin
From:
Sent:
To:
Subject:
JimHMorrison@cs.com
Thursday, March 29, 2001 7:00 PM
kbenner@ci.oshkosh.wi.us
Reports & Letter - aSH Kosh Water Treatment Facility
~
FE6068-6.0zone
Generator-Model... Hi Kevin:
Here are the reports & letter for the Ozone generators & PLC panel supplied
by PCI-Wedeco. All four panels are labeled. If there are any problems for you
to open attachments, let me know & I will fax to you. I had a crazy schedule
so I unfortunately will not be able to meet you @ the site.
If you have any questions, please don't hesitate to contact me.
Regards
Jim
1
Benner. Kevin
From:
Sent:
To:
Subject:
Lisa. Esp ineli@us.ul.com
Thursday, April 12, 2001 3:01 PM
kbenner@ci.oshkosh.wLus
Field Report for Square D Transformer
Hi Kevin,
I talked to the Designated Engineer in the Northbrook Office for transformers, Mr. Steve Prisby. In addition, I had
the Field Representative visit the manufacturing facilities to confirm current construction complies with the UL
Procedure.
We confirmed that the model 300T3H was manufactured in 1992.1993 at about 200 units. They have not made
a model for Square D since then. However, they currently have the model T2H300S which has the same
construction details as the 300T3H.
The Quality Facilitator stated that the units manufactured in 1992-1993 never left the facility with the bonding
strap bonded to the ventilation grill. There was always a grounding bond area that was located at the side of the
unit, which was in compliance with the NEC code. An attempt was made on the model T2H300S to simulate the
bonding strap being installed on the ventilation grill. The strap was not long enough to reach the ventilation grill.
This leads us to believe the unit was modified in the field.
Can you recall if you saw a hole on the side of the transformer? Please advise.
The DE and I reviewed ULl516, the NEC code for grounding. He recommended that ULl516 be revised to
include a section on grounding & bonding and that UL Procedures have a description added, addressing how
these transformers should be grounded and bonded. We are currently and actively working on implementing his
recommendations.
If you have any questions concerning the information provided please contact me.
Regards,
Lisa Espineli
Project Engineer
Field Report Group
Phone: 847-272-8800 Ext. 43241
Fax: 847-509-6240
E-mail: Lisa.Espineli@us.ul.com
********* Internet E-mail Confidentiality Disclaimer **********
This e-mail message may contain privileged or confidential
information. If you are not the intended recipient, you may not
disclose, use, disseminate, distribute, copy or rely upon this
message or attachment in any way. If you received this e-mail
message in error, please return by forwarding the message and
its attachments to the sender.
Underwriters Laboratories Inc., its subsidiaries and affiliates,
does not accept liability for any errors, omissions, corruption
or virus in the contents of this message or any attachments that
1
03/23/01 FRI 09:32 FAX 4162410682
141001
............. .........
.....................
II. .
.... . .
"'..-....=
'<<1~
~~=~"
Field Evaluation
Services
CSA and US STANDARDSICODES
To: Kevin Benner - Electrical Inspector - City From: Jim Morrison, C.E.T. CEI.
of Oshkosh
Fa."{: 920-236--5084
Pages: 2
P!sone: 920-236-5046
Cate: 3/23/01
Re:
Wisconsin Accreditation letter
CC~
o Urgem
x For Review
o Please Conunent tJ Please Reply 0 Please Rec] \ :4e
e C@r-nments: Hi Kevin:
Please find attached the accreditation letter from the State of Washington recognizing Entela.
If you have any further Questions or need further supporting documents, please feel free to contat: t me.
Regards
Jim Morrison
Director of Operations
)> Toronto<==<==<==<=<=Jim Morrison<=<= Cell Phone if ; 416-318-9104
)> Voice Mail '#; 416-330-6929
)> Office #:: 1-877-74&4m
)> Facsimile # ; 9tJ5-859.G697
)> Emai! ;iimhmomson@:cs.com
}:> IlJww.€lPsF.sldevaluations.com