Loading...
HomeMy WebLinkAbout0126459-Plumbing (abandon laterals) e CITY OF OSHKOSH No 126459 OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 1438 W SOUTH PARK AVE Owner KLJ LLC Create Date 08/24/2007 Contractor COATS, KEITH Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Category 401 - Residential-Exterior (laterals) Shower Water Softner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest FlrlWst Sink Lndry Tray Clothes Wshr Exam Sink Catch Basin Disposal Bidet Sculry Sink Wash Ftn Dishwasher Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp ; Use/Nature It\BANDON SANITARY SEWER AND WATER Llt\TERAL AT ROW TO RAZE DWELLING. of Work , Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Valuation Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service $700.00 Plan Approval $0.00 Permit Fees $25.00 0 Permit Voided I Issued By Parcelld # 1307320000 Date 08/24/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement hold res) to se e y n ry app efore starting such activity. Signature Address Agent/Owner WINNECONNE 8424 SHIRLEY CT WI 54986 - 9533 Telephone Number Date P-~r"-E.17 920-582-3975 To schedule inspections please call the Inspection Request line at 236-5128 not,ng the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.