HomeMy WebLinkAbout0126459-Plumbing (abandon laterals)
e CITY OF OSHKOSH No 126459
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1438 W SOUTH PARK AVE Owner KLJ LLC Create Date 08/24/2007
Contractor COATS, KEITH
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Category 401 - Residential-Exterior (laterals)
Shower Water Softner Wait. St. Shamp Sink
Floor Drain Local Waste Ice Chest FlrlWst Sink
Lndry Tray Clothes Wshr Exam Sink Catch Basin
Disposal Bidet Sculry Sink Wash Ftn
Dishwasher Beer Tap Hand Sink Urinal
Sump Pump Lab Sink Plaster Sink Standp Rec
Classrm Sink Sterilizer Surgeons Sink Ice Maker
Breakrm Sink Dip Well F Prep Sink Gar Drain
Ejector/Grind Drink Ftn Serv Sink Soda Disp
;
Use/Nature It\BANDON SANITARY SEWER AND WATER Llt\TERAL AT ROW TO RAZE DWELLING.
of Work ,
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Valuation
Size
Material
Type
#
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
$700.00 Plan Approval
$0.00 Permit Fees
$25.00 0 Permit Voided I
Issued By
Parcelld #
1307320000
Date 08/24/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement hold res) to se e y n ry app efore starting such activity.
Signature
Address
Agent/Owner
WINNECONNE
8424 SHIRLEY CT
WI 54986 - 9533
Telephone Number
Date P-~r"-E.17
920-582-3975
To schedule inspections please call the Inspection Request line at 236-5128 not,ng the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.