Loading...
HomeMy WebLinkAbout0126457-Building G OSHKOSH ON THE WATER Job Address 601 W 6TH AVE CITY OF OSHKOSH No 126457 BUILDING PERMIT - APPLICATION AND RECORD Owner MARK W SHOWERS Create Date 08/21/2007 Designer Contractor OWNER Category 221 - New Offices, Banks, Professional Plan Z2-2043-0807 Type . Building o Sign o Canopy o Fence o Raze Zoning C3 Class of Const: 5Bibc Size irreg Unfinished/Basement ~ Sq. Ft. Rooms Height Ft. o Projection I Finished/Living ~ Sq.Ft. ~ Sq.Ft. Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures Use/Nature New Office/ 1584 sf office with basement, 780 sf attached garage. Work above the foundation.* Condition of Permit Issuance: Approval of Work Iof a Drainage/Utility Plan shall be obtained from the City of Oshkosh Engineering Division prior to grading and paving the parking lot. HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $0.00 Permit Fee Paid $310.00 Park Dedication $0.00 Issued By: Date 08/24/2007 FinaI/O.P. 00/00/0000 o Permit Voided I Parcelld # 0601910000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure ne~e~sa?: approvals before starting such activity. Signature W....- Agent/Owner Date O%Ia;.;ju-7 Address 280 E FERNAU AVE OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless speCified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.