HomeMy WebLinkAbout0126457-Building
G
OSHKOSH
ON THE WATER
Job Address 601 W 6TH AVE
CITY OF OSHKOSH No 126457
BUILDING PERMIT - APPLICATION AND RECORD
Owner MARK W SHOWERS Create Date 08/21/2007
Designer
Contractor OWNER
Category
221 - New Offices, Banks, Professional Plan Z2-2043-0807
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
C3
Class of Const: 5Bibc
Size irreg
Unfinished/Basement ~ Sq. Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
~ Sq.Ft.
~ Sq.Ft.
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
Use/Nature New Office/ 1584 sf office with basement, 780 sf attached garage. Work above the foundation.* Condition of Permit Issuance: Approval
of Work Iof a Drainage/Utility Plan shall be obtained from the City of Oshkosh Engineering Division prior to grading and paving the parking lot.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$0.00 Permit Fee Paid
$310.00 Park Dedication
$0.00
Issued By:
Date 08/24/2007
FinaI/O.P. 00/00/0000
o Permit Voided I
Parcelld # 0601910000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure ne~e~sa?: approvals before starting such activity.
Signature W....-
Agent/Owner
Date O%Ia;.;ju-7
Address
280 E FERNAU AVE
OSHKOSH
WI 54901 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless speCified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.