Loading...
HomeMy WebLinkAbout0126400-Building (Fire Sprinkler system-4th fl) e OSHKOSH ON THE WATER Job Address 1130 N WESTFIELD ST CITY OF OSHKOSH No 126400 BUILDING PERMIT - APPLICATION AND RECORD Owner EVERGREEN MANOR INC Create Date 08/22/2007 Contractor AHERN FIRE PROTECTION Designer Terrence J Julka Category 220 - Alteration Hospitals & Institutions Plan 24-2085-0807 Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Fee $0.00 Flood Plain No Height Permit Not Required Occupancy Permit Not Required Park Dedication Not Required # Dwelling Units o # Structures o Use/Nature Installation of new Automatic Fire Sprinkler system on the 4th floor as per plans submitted. of Work HV AC Contractor Plumbing Contractor Electric Contractor , 0.00 Plan Approval $0.00 Permit Fee Paid $253.00 Park Dedication $0.00 Issued By: Date 08/22/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcel Id # 1608640000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 201 Morris Court Agent/Owner Fond du Lac WI 54936 - 0000 Telephone Number 920-921-9020 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.