HomeMy WebLinkAbout0126400-Building (Fire Sprinkler system-4th fl)
e
OSHKOSH
ON THE WATER
Job Address 1130 N WESTFIELD ST
CITY OF OSHKOSH No 126400
BUILDING PERMIT - APPLICATION AND RECORD
Owner EVERGREEN MANOR INC Create Date 08/22/2007
Contractor AHERN FIRE PROTECTION
Designer
Terrence J Julka
Category
220 - Alteration Hospitals & Institutions
Plan 24-2085-0807
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq.Ft.
Sq.Ft.
Sq. Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Fee
$0.00 Flood Plain No
Height Permit Not Required
Occupancy Permit Not Required
Park Dedication
Not Required
# Dwelling Units
o
# Structures
o
Use/Nature Installation of new Automatic Fire Sprinkler system on the 4th floor as per plans submitted.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
, 0.00 Plan Approval
$0.00 Permit Fee Paid
$253.00 Park Dedication
$0.00
Issued By:
Date 08/22/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcel Id # 1608640000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 201 Morris Court
Agent/Owner
Fond du Lac
WI 54936 - 0000 Telephone Number 920-921-9020
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.