Loading...
HomeMy WebLinkAbout0126381-Plumbing (drinking fountain) e OSHKOSH ON THE WATER Job Address 325 SEAGLE ST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 126381 Contractor OSHKOSH AREA SCHOOL DISTRICT Bathtub Shower Water Softner Whirlpool Floor Drain Local Waste Lavatory Lndry Tray Clothes Wshr Toilet Disposal Bidet Res. Sink Dishwasher Beer Tap Bar Sink Sump Pump Lab Sink Water Heater Classrm Sink Sterilizer Site Drain Breakrm Sink Dip Well Roof Drain Ejector/Grind Drink Ftn Misc. Fixtures Use/Nature Install new dual drinking fountain. of Work Owner OSH AREA SCHL DIST TIPLER JR HIGH Category 440 - Industrial-Interior Wait. St. Shamp Sink Ice Chest FlrlWst Sink Exam Sink Catch Basin Sculry Sink Wash Ftn Hand Sink Urinal Plaster Sink Standp Rec Surgeons Sink Ice Maker F Prep Sink Gar Drain Serv Sink Soda Disp Create Date 08/21/2007 Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Size Sanitary Sewer Storm Sewer Water Service Material Type # Conn. Type Valuation $800.00 $0.00 Parcel Id # 0611640100 Plan Approval Issued By Permit Fees $25.00 0 Permit Voided I Date 08/21/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, jf you perform the work described in this permit application withi n easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure ne ss appro. /U~re ~@h_ activity. Signature /.... ~ ( Agent/Owner Address PO BOX 3048 OSHKOSH Date ~:2!~ 7ft5? WI 54903 - 3048 Telephone Number (920) 424-0135 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.