Loading...
HomeMy WebLinkAbout0126360-Building (foundation walls) e OSHKOSH ON THE WATER Job Address 624 SEAGLE ST CITY OF OSHKOSH No 126360 BUILDING PERMIT - APPLICATION AND RECORD Owner THOMAS J LAST Create Date 08/20/2007 Contractor SURE-DRY-BASEMENT SYSTEMS INC Designer Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Rooms Height Ft. o Projection I Finished/Living Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation o Poured Concrete 0 Floating Slab . Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature RES/ Stabilize two foundation walls with 14 Grip Tite Anchors and 2 Power Braces. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuatio $6,190.00 Plan Approval $0.00 Permit Fee Paid $67.00 Park Dedication Issued By: $0.00 Date 08/20/2007 FinaIlO.P. 00/00/0000 o Permit Voided I Parcelld # 0611190000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,_ if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secur nYlneces rov ~ng such activity. Signature ~ Date 7'-Zo-6,:? /' Address 754 W AIRPORT RD Agent/Owner MENASHA WI 54952 - 1409 Telephone Number 920-967-9655 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.