HomeMy WebLinkAbout0126359-Building (foundation)
G
OSHKOSH
ON THE WATER
Job Address 422 DOVE ST
CITY OF OSHKOSH No 126359
BUILDING PERMIT - APPLICATION AND RECORD
Owner RUSSELL F MUCH Create Date 08/20/2007
Contractor SURE-DRY-BASEMENT SYSTEMS INC
Designer
141 _ Exterior Remodeling Plan
Category
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height Ft.
D Projection I
Finished/Living
Sq.Ft.
Bedrooms
Stories
Canopies
Sq.Ft.
Baths
Signs
Garage
Foundation
o Poured Concrete 0 Floating Slab
. Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
o
# Structures
o
Park Dedication
# Dwelling Units
Use/Nature SFR/ Stabilize one foundation wall with 7 Grip Tite wall anchors.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Issued By:
$3,985.00 Plan Approval
$0.00 Permit Fee Paid
$46.00 Park Dedication
$0.00
Fees: Valuatio
Date 08/20/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1610510000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which, it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to se any n ssary ovals before starting such activity.
Signature
Date
};--Z'o -07
Address
754 W AIRPORT RD
Agent/Owner
MENASHA
WI 54952 - 1409
Telephone Number
920-967-9655
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.