Loading...
HomeMy WebLinkAboutRough Building 1/5/1994 (i;!@ FZIF CoPj ~ OJHKOJH City of Oshkosh P.o. BOX 1130 OSHKOSH, WI 54902-1130 ON THE WATER January 5, 1994 Paul the Carpenter Attn: Paul Paulick 1826 Simpson Street Oshkosh, WI 54901 Dear Paul: Per your request a rough framing inspection was made at 1634 Hickory Street on January 5, 1994. The following items were found to be in noncompliance: 1) Per ILHR 21.22, install metal framing anchors on floor joists as discussed on site. 2) Per ILHR 21.22, newly installed floor joists are overspanned. 3) Per ILHR 22.28, newly installed roof rafters are overspanned. 4) Per ILHR 21.04, the riser heights on the stairway to the second floor must not exceed 8 inches, and must be uniform to within 3/16 of an inch. 5) Per ILHR 21.22, a bearing wall or support column must be installed adjacent to the stairway leading to the second floor. 6) Per ILHR 21.22, existing floor joists and other structural members must be properly supported where bearing walls have been removed. 7) Per ILHR 21.03, any second floor sleeping area must meet the minimum egress requirements for window size. (net clear opening at least 20 inches wide by 24 inches high, with a maximum sill height of 46 inches). 8) Per ILHR 21.06, all habitable rooms must meet the minimum ceiling height requirements. (50% at least 7 feet in height). All above items must be corrected, and a reinspection called for prior to the closing up of any walls. As we, discussed on the jobsite, my recommendation is that you contact an engineer to furnish our office with details and a stamped letter with reference to the structural corrections to be made. Please call 236-5051 if you have any further questions in this matter. ~..inc" ely, ....~ Kenneth S. Staehler Building Inspector