HomeMy WebLinkAboutRough Building 1/5/1994
(i;!@
FZIF
CoPj
~
OJHKOJH
City of Oshkosh
P.o. BOX 1130
OSHKOSH, WI 54902-1130
ON THE WATER
January 5, 1994
Paul the Carpenter
Attn: Paul Paulick
1826 Simpson Street
Oshkosh, WI 54901
Dear Paul:
Per your request a rough framing inspection was made at 1634
Hickory Street on January 5, 1994. The following items were found
to be in noncompliance:
1) Per ILHR 21.22, install metal framing anchors on floor joists as
discussed on site.
2) Per ILHR 21.22, newly installed floor joists are overspanned.
3) Per ILHR 22.28, newly installed roof rafters are overspanned.
4) Per ILHR 21.04, the riser heights on the stairway to the second
floor must not exceed 8 inches, and must be uniform to within 3/16
of an inch.
5) Per ILHR 21.22, a bearing wall or support column must be
installed adjacent to the stairway leading to the second floor.
6) Per ILHR 21.22, existing floor joists and other structural
members must be properly supported where bearing walls have been
removed.
7) Per ILHR 21.03, any second floor sleeping area must meet the
minimum egress requirements for window size. (net clear opening at
least 20 inches wide by 24 inches high, with a maximum sill height
of 46 inches).
8) Per ILHR 21.06, all habitable rooms must meet the minimum
ceiling height requirements. (50% at least 7 feet in height).
All above items must be corrected, and a reinspection called for
prior to the closing up of any walls. As we, discussed on the
jobsite, my recommendation is that you contact an engineer to
furnish our office with details and a stamped letter with reference
to the structural corrections to be made. Please call 236-5051 if
you have any further questions in this matter.
~..inc" ely,
....~
Kenneth S. Staehler
Building Inspector