Loading...
HomeMy WebLinkAbout0126308-Building (awning) e OSHKOSH ON THE WATER Job Address 101 COMMERCE ST CITY OF OSHKOSH No 126308 BUILDING PERMIT - APPLICATION AND RECORD Owner BAYSHORE DEVELOPMENT II LLC Create Date 08/16/2007 Designer Leon Luker Contractor OSHKOSH TENT & AWNING CO INC Category 254 - Signs Plan Type o Building C-3DO . Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. Finished/Living Sq. Ft. Bedrooms Stories - Garage Sq.Ft. Baths - Foundation . Poured Concrete 0 Floating Slab o Pier o Other o Concrete Block o Post o Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 D Projection I Canopies Signs Use/Nature Install 01 awning (4.08' X 20.00') installed on south elevation proposed to include text on awning valance. Auning will have 2.14 sq. ft. of of Work ~raphic signage HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2,472.75 Plan Approval $0.00 Permit Fee Paid $39.00 Park Dedication $0.00 Issued By: cry Date 08/16/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0100600101 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongl urges the permit applicant to contact the easement holder(s) and to secure any necessary a a before s rti uch ctivity. Date ':< 8-/~ Signature Address 110 E FERNAU AVE OSHKOSH WI 54901 - 0000 Telephone Number 235-3170 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.