HomeMy WebLinkAbout0126286-Building
e
OSHKOSH
ON THE WATER
Job Address 2737 HARRISON ST
CITY OF OSHKOSH No 126286
BUILDING PERMIT: APPLICATION AND RECORD
Owner OSHKOSH TRUCK CORP Create Date 08/15/2007
Contractor MIRON CONSTRUCTION CO INC
Designer
Category
211 - Alteration Industrial Plan 21-2036-0707
Type
. Building
o Sign
o Canopy o Fence o Raze
Class of Const: Size
Rooms Height Ft. D Projection I
~ ~
Bedrooms Stories Canopies
~
Baths Signs
Zoning
Unfinished/Basement Sq. Ft.
Finished/Living 19200 Sq. Ft.
Garage Sq. Ft.
Foundation 0 Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier . Other
o Treated Wood
Occupancy Permit Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature Factory/Interior alterations - remodel first floor office area under existing mezzanine and office build out of existing unfinished mezzanine
of Work eve!.
HV AC Contractor
AUGUST WINTER & SONS INC
Plumbing Contractor LEE PLUMBING INC
Electric Contractor NORTHLAND ELECTRICAL SERVICES LLC
Fees: Valuation
$1,459.00 Park Dedication
$0.00
$456,568.00 Plan Approval
$0.00 Permit Fee Paid
Issued By:
Date 08/15/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1519600000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
h~lder(S) and~to. se e an~nec ~ary approvals before starting such activity.
Signature ~. ~~ Date O~/5-07
Agent/Owner
PO BOX 509
NEENAH
WI 54957 - 0509
Telephone Number
920-969-7053
Address
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.