Loading...
HomeMy WebLinkAbout0126274-Building o OSHKOSH ON THE WATER Job Address 613 FREDERICK ST CITY OF OSHKOSH No 126274 BUILDING PERMIT - APPLICATION AND RECORD Owner NU VIEW PROPERTIES LLC Create Date 07/18/2007 Designer Contractor OWNER Plan Category 140 - Interior Remodeling Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Rooms Height Ft. o Projection I Finished/Living Bedrooms Stories Canopies Sq.Ft. Baths Signs Garage Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFRI Converting the duplex to a single family' and rearranging the stairs and kitchen and upper kitchen areas to be converted to a 2nd of Work floor laundry, the framing for the 1 st floor will be reinforced in areas that have been deteriorated. HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3,000.00 Plan Approval $0.00 Permit Fee Paid $39.00 Park Dedication $0.00 Issued By: '4 Date 08/15/2007 FinaIlO.P. 00/00/0000 o Permit Voided I Parcelld # 0703590000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secttfe a,%!\ne~ssa~aPfjr vals .before stMing such activity. Signature "f- ~A ~LQJJ.JvY}1/e---- Date 'X 8-} S -01 Agent/Owner Address 4768 BAYVIEW LN OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.