Loading...
HomeMy WebLinkAbout0126291-Building (driveway) o OSHKOSH ON THE WATER Job Address 1415 COOLIDGE AVE CITY OF OSHKOSH No 126291 BUILDING PERMIT - APPLICATION AND RECORD Owner DONALD E SCHUELKE Create Date 08/15/2007 Designer Contractor OWNER Category 256 - Parking Lots, Driveways Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFRI Replacing the existing driveway. with concrete. The size of the driveway will stay the same. Vinton will be doing the work. of Work HV AC Contractor Plumbing Contractor Electric Contractor $2,500.00 Plan Approval $39.00 Park Dedication $0.00 Fees: Valuation $0.00 Permit Fee Paid Issued By: CV) Date 08/15/2007 FinaIlO.P. 00/00/0000 o Permit Voided I Parcelld # 1603380000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to sec any necessary appro Is b ore starting such activity. Signature J<-J. Date 5k -17' ,. 6 7 AgenUOwner Address 1415 COOLIDGE AVE OSHKOSH WI 54902 - 3318 Telephone Number 233-4166 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.