HomeMy WebLinkAbout0126291-Building (driveway)
o
OSHKOSH
ON THE WATER
Job Address 1415 COOLIDGE AVE
CITY OF OSHKOSH No 126291
BUILDING PERMIT - APPLICATION AND RECORD
Owner DONALD E SCHUELKE Create Date 08/15/2007
Designer
Contractor OWNER
Category
256 - Parking Lots, Driveways Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Sq.Ft.
Bedrooms
Stories
Canopies
Garage
Sq.Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature SFRI Replacing the existing driveway. with concrete. The size of the driveway will stay the same. Vinton will be doing the work.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
$2,500.00 Plan Approval
$39.00 Park Dedication
$0.00
Fees: Valuation
$0.00 Permit Fee Paid
Issued By:
CV)
Date 08/15/2007
FinaIlO.P. 00/00/0000
o Permit Voided I
Parcelld # 1603380000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to sec any necessary appro Is b ore starting such activity.
Signature J<-J. Date 5k -17' ,. 6 7
AgenUOwner
Address 1415 COOLIDGE AVE
OSHKOSH
WI 54902 - 3318 Telephone Number 233-4166
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.