HomeMy WebLinkAbout0126259-Building
e
OSHKOSH
ON THE WATER
Job Address 191 W 28TH AVE
CITY OF OSHKOSH No 126259
BUILDING PERMIT - APPLICATION AND RECORD
Owner HYDRITE CHEMICAL CO Create Date 08/14/2007
Designer
Contractor KLEIN'S HOME IMPROVEMENT
Category
211 _ Alteration Industrial Plan
Type
. Building
o Sign
o Canopy o Fence o Raze
Class of Const: Size
Rooms Height Ft. o Projection I
Bedrooms Stories Canopies
Baths Signs
Zoning
Unfinished/Basement
Sq.Ft.
Finished/Living
Sq.Ft.
Sq.Ft.
Garage
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature Industrial! Sreakroom remodel. to include a dropped ceiling. Thompson Htg & Clg will extend the ducts for HVAC. The room will be
of Work extured painted, trimmed and re-f1oored.
HVAC Contractor Plumbing Contractor
Electric Contractor DILLMAN ELECTRIC
Fees: Valuation
$1,400.00 Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Issued By:
Date 08/14/2007
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1413300000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to se re y necessary approvals before starting such activity.
Signature
Date
~ 0--)4-07
Address PO BOX 702
Agent/Owner
OSHKOSH
WI 54903 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.