Loading...
HomeMy WebLinkAbout0126257-Building G OSHKOSH ON THE WATER Job Address 446 W 16TH AVE CITY OF OSHKOSH No 126257 BUILDING PERMIT - APPLICATION AND RECORD Owner MARK THIERMAN Create Date 08/14/2007 Designer Contractor OWNER Category 170 - Conversions Plan Zoning . Building o Sign o Canopy o Fence o Raze Type Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. o Projection I Finished/Living Sq. Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature CONVERSION/ Coverting the duplex to a single family by removing the 2nd floor kitchen. The doorway to the 2nd floor will be opened up of Work 10 the 1 st floor. The owner was informed of the fact that in the futue the bUilding use will not be allowed to be converted to a duplex ithout bringing the entire building in compliance with the codes at the time of conversion. HV AC Contractor Plumbing Contractor UNKNOWN Electric Contractor Fees: Valuation Issued By: ~~ $500.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 Date 08/14/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 0907630000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure, any necessa~p~ovals before starting such activity. Signature r ~~ /~ Date.~f5~/l..J-( Agent/Owner Address 446 W 16TH AVE OSHKOSH WI 54902 - 6857 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.