HomeMy WebLinkAbout0126257-Building
G
OSHKOSH
ON THE WATER
Job Address 446 W 16TH AVE
CITY OF OSHKOSH No 126257
BUILDING PERMIT - APPLICATION AND RECORD
Owner MARK THIERMAN Create Date 08/14/2007
Designer
Contractor
OWNER
Category
170 - Conversions
Plan
Zoning
. Building
o Sign
o Canopy
o Fence
o Raze
Type
Class of Const:
Size
Unfinished/Basement
Sq.Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Sq. Ft.
Bedrooms
Stories
Canopies
Garage
Sq.Ft.
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature CONVERSION/ Coverting the duplex to a single family by removing the 2nd floor kitchen. The doorway to the 2nd floor will be opened up
of Work 10 the 1 st floor. The owner was informed of the fact that in the futue the bUilding use will not be allowed to be converted to a duplex
ithout bringing the entire building in compliance with the codes at the time of conversion.
HV AC Contractor
Plumbing Contractor
UNKNOWN
Electric Contractor
Fees: Valuation
Issued By: ~~
$500.00 Plan Approval
$0.00 Permit Fee Paid
$25.00 Park Dedication
$0.00
Date 08/14/2007
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 0907630000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure, any necessa~p~ovals before starting such activity.
Signature r ~~ /~ Date.~f5~/l..J-(
Agent/Owner
Address 446 W 16TH AVE
OSHKOSH
WI 54902 - 6857 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.