Loading...
HomeMy WebLinkAbout0126163-Plumbing (RP valve) o OSHKOSH ON THE WATER Job Address 325 SEAGLE ST PLUMBING PERMIT - APPLICATION AND RECORD CITY OF OSHKOSH No 126163 Owner OSH AREA SCHL DIST TIPLER JR HIGH Create Date 08/08/2007 Plan Contractor BASSETT MECHANICAL Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Category 440 - Industrial-Interior Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Install RP valve serving boiler. RP valve shall be reg. and tested per COMM 82.41. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 0611640100 Use/Nature of Work Valuation Issued By Shower Water Softner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest FlrlWst Sink Lndry Tray Clothes Wshr Exam Sink Catch Basin Disposal Bidet Sculry Sink Wash Ftn Dishwasher Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp $2,400.00 $0.00 Permit Fees $25.00 0 Permit Voided I Date 08/08/2007 Plan Approval In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to ec r any n ssary approvals before starting such activity. Signature Date ;;;r/dJ7 Agent/Owner Address PO BOX 7000 KAUKAUNA WI 54130 - 7000 Telephone Number 800-236-2502==920- To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.