HomeMy WebLinkAbout0126162-Plumbing (RP valve/boiler)
o
OSHKOSH
ON THE WATER
Job Address 1100 W SMITH AVE
CITY OF OSHKOSH No 126162
PLUMBING PERMIT - APPLICATION AND RECORD
OwnerOSH AREA SCHL DIST NORTH HIGH Create Date 11/15/2006
Plan
Category 440 - Industrial-Interior
Contractor BASSETT MECHANICAL
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Shower Water Softner Wait. St. Shamp Sink
Floor Drain Local Waste Ice Chest FlrlWst Sink
Lndry Tray Clothes Wshr Exam Sink Catch Basin
Disposal Bidet Sculry Sink Wash Ftn
Dishwasher Beer Tap Hand Sink Urinal
Sump Pump Lab Sink Plaster Sink Standp Rec
Classrm Sink Sterilizer Surgeons Sink Ice Maker
Breakrm Sink Dip Well F Prep Sink Gar Drain
Ejector/Grind Drink Ftn Serv Sink Soda Disp
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Install RP valve in boiler room. State trans #1341658
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcel Id #
1219400000
Valuation
Issued By
$2,200.00 Plan Approval
$0.00 Permit Fees
$25.00 D Permit Voided I
Date 08/08/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an asement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secur an n sary approvals before starting such activity.
Signature ~ Date
Agent/Owner
Address PO BOX 7000
KAUKAUNA
WI 54130 - 7000 Telephone Number 800-236-2502==920-
#'/t::J?
~
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.