Loading...
HomeMy WebLinkAbout0126188-Building G OSHKOSH ON THE WATER Job Address 25 W 12TH AVE CITY OF OSHKOSH No 126188 BUILDING PERMIT - APPLICATION AND RECORD Owner JOSEPH M LENTZ Create Date 08/09/2007 Designer Contractor OWNER Category 140 -Interior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Sq. Ft. Sq.Ft. Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature ~FRt Remodeling the existing kitchen (no walls will be moved) and installing washer and dryer hookuPs in an existing closet off the of Work kitchen. HV AC Contractor Plumbing Contractor WELLNITZ PLUMBING Electric Contractor SLIM'S ELECTRIC INC Issued By: Fees: Valuation ~ $5,000.00 Plan Approval $0.00 Permit Fee Paid $53.00 Park Dedication $0.00 Date 08/09/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 0303570000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit ~.'pPliPation within an ease ent, the City strongly urges the permit applicant to contact the easement holder(s) and to cure ffny, ecessa,ry ap r als efore starting such activity. ~. 8- cr-o Signature I tI&. Date _ . Agent/Owner Address 635 W 5TH AVE OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.