Loading...
HomeMy WebLinkAbout2007-Building (ground sign) e OSHKOSH ON THE WATER Job Address 3265 S WASHBURN ST CITY OF OSHKOSH No 126026 BUILDING PERMIT - APPLICATION AND RECORD Owner BERGSTROM FOX VALLEY INC Create Date 07/31/2007 Designer Lorri Hendzel Contractor JONES SIGN COMPANY INC Category 254 - Signs Plan Type o Building M-1 PD . Sign o Canopy o Fence o Raze Zoning Class of Const: Size UnfinishedlBasement Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I FinishedlLiving Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication UselNature ~uto Sales / Alterations to existing ground sign, Re-face sign cabinets and install new Electronic Message Center. of Work Plumbing Contractor HV AC Contractor Electric Contractor Fees: Valuation $30,695.00 Plan Approval Issued By: ~ $0.00 Permit Fee Paid $181.00 Park Dedication $0.00 Date 07/31/2007 FinaIIO.P. 00/00/0000 D Permit Voided I Parcelld # 1365010000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit a plication within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secur cessary approvals before starting such activity. Signature Date /- ~/v ') - Address 1711 SCHERING RD AgentlOwner DE PERE WI 54115 - 0000 Telephone Number 920-983-6700 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.