HomeMy WebLinkAboutBuilding/HVAC Z1-2036-0707
~
OJHKOfH
City of Oshkosh
Division of Inspection Services
215 Church Avenue
PO Box 1130
Oshkosh WI 54903-1130
www.ci.oshkosh.wi.us
ON THE ,WATER
July 27, 2007
Tom Karrels
Thomas R. Karrels P.E.S,C.
1934 Algoma Blvd.
Oshkosh WI 54901
Bert Fredricksen
. Fredricksen Engineering lne
. 12308 Corporate Pkwy. Suite 400
Mequan, WI 53092-3381
Ryan Meyers
Oshkosh Truck Corp.
2307 Oregon St
Oshkosh, WI 54901
Site: Plan Number: ZI-2036-0707
Oshkosh Truck Corporation - Defense Plant
2737 Harrison St
Oshkosh WI 54901
For:
\ Description: Mezzanine alterations
Object Type: Building and HV AC
Class of Construction: IIB - 19,200 Sq Ft.; Sprinkle red
Occupancy: B: Business / Office and F : Factory Industrial Fl
The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes and
Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defined in Chapter
101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements
Key Item(s) / Conditions:
· IBC 710.4 Continuity. The supporting construction shall be protected to afford the required fire-resistance
rating of the horizontal assembly supported. The elevator equipment room has a structural beam
supporting the ceiling of this room, penetrating the walls and exposed in the equipment room. Per
discussion with designer the beam will be boxed out to be excluded from this room, there by
maintaining the required rating of the walls and ceilings of this room. Provide detail chos~n to box out
beam and maintain required rating.
· IBC 711.3 Any penetrations of fire rated assemblies are required to be protected with a listed firestopping
system that matches the rating of the wall assembly being penetrated. Sheet H5.1 details "pack and
caulk" are not firestopping systems, copies of the firestopping systems are required to be provided at the
time of inspection
· IFC 901.4 Fire protection systems shall be maintained in accordance with the original installation
standards for that system. Required fire protection systems shall be extended, altered, or augmented as
necessary to maintain and continue protection whenever the building is altered, remodeled or added to.
Alterations to fire protection systems shall be done in accordance with applicable standards. Submit plans
for fire sprinkler modifications.
· IBC 906.1/ IFC 906.3 The maximum travel distance allowed to a fire extinguisher is 75 feet.
\\OSHKOSHM ISFS\Dcpmtmcnt'i\!nspcctimls\Plan Revkw\OJ1ilITI\,rcial Plan Rcri(?\\' 200TZ1 -2036-0707 27 T! l!arl'ism\ S1 Bldg &. llVAC.doc
Page 1 00
· IBC 907.14 Any fire alarm system required by this Chapter is required to be monitored by an approved
supervising station in accordance With NFP A 72. Notes in sheet E3.1 under supervision do not indicate
the required supervision, verify that supervision will be in compliance with this section.
· Comm 62.1109 (4) Kitchens, kitchenettes and wet bars. Where kitchen, kitchenettes and wet bars are
proVided in accessible spaces or rooms, they shall be accessible in accordance with ICC/ANSI Al17.1.
Elevation 9 on Sheet A5.1 does not appear to comply with accessibility requirements for counters, verify
compliance with ANSI A117.1 requirements.
· NEC 110.26 Spaces About ElectriCal Equipment. Sufficient access and working space shall be
proVided and maintained about all electric equipment to permit ready and safe operation and maintenance
of such equipment. Verify that the appropriate clearances required by this section are being maintained
around V A V's
· IMC 403.3.3 Variable air volume air distribution systems, other than those designed to supply only 100%
outdoor air shall be provided with controls to regulate the flow of outdoor air. Such controls shall be
designed to maintain the flow of outdoor air at a rate not less than required by Section 403 over the entire
range of supply air operating rates. Verify that controls are configured per Section 15964B Part 3 3.3 B
7. of specifications provided - this should be reflected in balance report
· IMC 602.2.1 Materials exposed within plenums. Except as required by Sections 602.2.1.1 through
602.2.1.4, materials exposed within plenums shall be noncombustible or shall have a flame spread index of
not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with
ASTM E 84. Material cut sheets showing this information shall be available for materials used in
plenum space.
· Comm 5.34 No person may perform structural welding unless the person holds a registration issued by
Department of Commerce. Provide welders registration numbers for all people doing welding on this
project.
· Comm 61.30(3) This review does not include lighting. Comm 63.0001 Prior to installation, lighting
plans and calculations shall be prepared in compliance with the code. The plans shall be available upon
request. .
· Comm 61.31(4) Revisions to approved plans. All proposed reVisions and modifications which involve
rules under this code and which are made to construction documents that have preViously been granted
approval by the department or its authorized representative, shall be submitted to the office that granted the
approval. All reVisions and modifications to plans shall be approved in writing by the department 'or its .
authorized representative prior to the work involved in the reVision or modification being carried out. A
revision or modification to a plan, drawing or specification shall be signed and sealed in accordance with
Comm 61.31{1).
· Comm 80 This plan review does not include plumbing. Prior to installation of plumbing, plans and
calculations are required to be submitted and approved.
\\OSH K( )SH M ISI'S\D,~pMmcms\fnspcctkm.;;\Plan RGvicw\Coirll11crdal Plan Review 20DTZ 1.:20}(}.0707 2737 Harrison Sf. Bldg &. HVAC.doe
Page 2 00
SUBMIT:
· IEec 503.3.3.7 [Conim 63.0503(2)(f)] Balancing and documentation of the HV AC system shall conform
to the IMC. Balancing report required to be submitted prior to final occupancy being allowed.
· IBC 1003.2.11 Means of egress illumination is required to be installed per this section. All paths of egress
through The Retail Display area are required to have adequate emergency lighting to meet the performance
requirements ofIBC 1003.2.11.3. Provide complete emergency lighting plan showing compliance with
these requirements prior to installation of emergency lighting system.
· Comm 61.50 (4) Supervision. Prior to the initial occupancy of an alteration the supervising professional
shall file a compliance statement form SBD-9720 with this office.
· NFP A 72 4.5.2 Provide a copy of the fire alarm system record or completion for the required monitoring
and alarms of the automatic fire sprinkler system
A copy of the approved plans, specifications, and this letter shall be on-site during construction. All permits are required to
be obtained prior to commencement of work.
In granting this approval the City of Oshkosh Inspection Services Department reserves the right to require changes or
additions should conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this
review shall relieve the designer of the responsibility for designing a safe building, structure, or component.
Inquiries concerning this correspondence may be made to me at the number listed below or the address on this letterhead.
~
Bnan Noe
Building Systems Consultant
(920) 236-5051 Monday- Friday 7:30AM. to 8:30 AM and 12:30 AM to 1:30 P.M.
bnoe@ci.oshkosh.wi.us
cc: Property file
Fee Required $
Fee Received $
Balance Due $
1110.00
1110.00
0.00
\\()SHKOSHM IS:FS\D(:parimeiTts\fflSiKdinll~\Plan RCI'icw\Commcn::ial Pian Review 2007\ZI-2036-0707 2737 Harl'i~;on S, Bldg & HVAC.duc'
Page 3 of3