Loading...
HomeMy WebLinkAbout0125992-Building (siding) o OSHKOSH ON THE WATER Job Address 1375 WINNEBAGO AVE CITY OF OSHKOSH No 125992 BUILDING PERMIT - APPLICATION AND RECORD Owner DJ VROMAN INVESTMENTS LLC Create Date 07/27/2007 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units o # Structures o Use/Nature Duplex! Replace old siding above porch on front elevation, replace 6 windows and door leading to porch. NO STRUCTURAL WORK of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation ,000.00 Plan Approval $0.00 Permit Fee Paid $46.00 Park Dedication $0.00 Issued By: Date 07/27/2007 Final/D.P. 00/00/0000 D Permit Voided I Parcel Id # 0206680000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and t~ecure;n necessary approvals before starting such activity. Signature /OJ . ~~ Date ?JA?107 Agent/Owner Address 347 LEGION PL OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i;e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.