HomeMy WebLinkAbout0125994-Plumbing (water heater)
e
OSHKOSH
ON THE WATER
Job Address 126 NEAGLE ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner CHRISTOPHER M COOPER
Contractor SOPER PLUMBING
Category 411 - Residential-Water Heaters
Bathtub Shower Water Softner Wait. St. Shamp Sink
Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin
Toilet Disposal Bidet Sculry Sink Wash Ftn
Res. Sink Dishwasher Beer Tap Hand Sink Urinal
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec
Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain
Roof Drain Ejector/G rind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
Use/Nature 'SFR / REPLACE GAS WATER HEATER **debt acct
of Work
No 125994
Create Date 07/27/2007
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Size
Type
#
Conn. Type
Material
Sanitary Sewer
Storm Sewer
Water Service
Valuation $600.00 Plan Approval
Issued By ~2r
$0.00 Permit Fees
$25.00 0 Permit Voided I
Parcelld #
0612840000
Date 07/27/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce e.asement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Address 2225 BURNWOOD DR
Agent/Owner
OSHKOSH
WI 54902 - 9003 Telephone Number 426-2151
Date
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.