HomeMy WebLinkAbout0125993-Building(Repair Units 45,47,49)
e
OSHKOSH
ON THE WATER
Job Address 215 DIVISION ST
CITY OF OSHKOSH No 125993
BUILDING PERMIT - APPLICATION AND RECORD
Owner SHIVA CORP Create Date 07/27/2007
Designer
Contractor CRAIG STAPEL
Category
202 - Alteration Hotels, Motels, Tourist Cabins Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Sq.Ft.
Sq.Ft.
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature Motel/ Units 45,47,49. Correcting violations in the bathrooms replacing drywall and tub surrounds.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1,500.00 Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Issued By:
Date 07/27/2007
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 0101360000
In the performan . of this work I agree to perform all work pursuant to rules governing the described construction.
While the City d Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this per. it application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to re 'l"1y necessa provals be~ starting such activity.
Date
k;;;27~ OJ
Signature
Address 908 E PARKWAY AVE
Agent/Owner
OSHKOSH
WI 54901 - 0000 Telephone Number 232-1374
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.