Loading...
HomeMy WebLinkAbout0125973-Building ". , ' .. OSHKOSH ON THE WATER Job Address 315 BALDWIN AVE CITY OF OSHKOSH No 125973 BUILDING PERMIT - APPLICATION AND RECORD Owner NICHOLAS B RYF Create Date 07/26/2007 Designer Contractor OWNER Category 149 - Raze detached garage, construct detached garage Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. - Finished/Living Sq.Ft. Bedrooms Stories Garage Sq.Ft. Baths Foundation . Poured Concrete o Floating Slab o Pier o Other o Concrete Block o Post o Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 D Projection I Canopies Signs Use/Nature SFR/ Raze the existing detached ga-rage and constructing 24'x32' detached garage in the rear yard. This permit also includes paving a of Work section of the driveway with asphalt. This permit does not include any electrical work. HV AC Contractor Plumbing Contractor Electric Contractor Fees: valuatiof). $11,000.00 Issued By: ~ ~ Plan Approval $0.00 Permit Fee Paid $94.00 Park Dedication $0.00 Date 07/26/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1002600100 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary a rovals before starting such activity. Signatur Agent/Owner OSHKOSH Date 'P ;;/i? ~ Address 3 WI 54901 - 3814 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.