Loading...
HomeMy WebLinkAbout0125955-Building (exterior wall covering) o OSHKOSH ON THE WATER Job Address 614 OREGON ST CITY OF OSHKOSH No 125955 BUILDING PERMIT - APPLICATION AND RECORD Owner M & R LEASING LLC Cr~ate Date 07/25/2007 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature Comm/ Siding' Removing the exterior wall coverings on the front of the buildingand replacing with metal to match the rest of the building. of Work Blackstone Sheet Metal will be doing the work. HV AC Contractor Plumbing Contractor Electric Contractor $8,700.00 Plan Approval $0.00 Permit Fee Paid $81.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 07/25/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcel Id # 0300220000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to .se re any nece a!y pprovals before starting such activity. Signature Date Address 614 OREGON ST OSHKOSH WI 54902 - 5966 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.