HomeMy WebLinkAbout0125955-Building (exterior wall covering)
o
OSHKOSH
ON THE WATER
Job Address 614 OREGON ST
CITY OF OSHKOSH No 125955
BUILDING PERMIT - APPLICATION AND RECORD
Owner M & R LEASING LLC Cr~ate Date 07/25/2007
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq.Ft.
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature Comm/ Siding' Removing the exterior wall coverings on the front of the buildingand replacing with metal to match the rest of the building.
of Work Blackstone Sheet Metal will be doing the work.
HV AC Contractor
Plumbing Contractor
Electric Contractor
$8,700.00 Plan Approval
$0.00 Permit Fee Paid
$81.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 07/25/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcel Id # 0300220000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to .se re any nece a!y pprovals before starting such activity.
Signature
Date
Address 614 OREGON ST
OSHKOSH
WI 54902 - 5966 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.