Loading...
HomeMy WebLinkAbout0125968-Plumbing e OSHKOSH ON THE WATER Job Address 1519 N MAIN ST CITY OF OSHKOSH No 125968 PLUMBING PERMIT - APPLICATION AND RECORD Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Owner DARLENE S/JEAN L NELSON Create Date 07/25/2007 Category 410 - Residential-Interior Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor GREEN BAY PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By Work in addition to permit #125967 to add a standpipe receptor under the kitchen sink for the dishwasher. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 1501350000 $50.00 $0.00 $7.00 0 Permit Voided I Plan Approval Permit Fees Date 07/25/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is' not a party, if you perform the work described in this permit plical' n within an easement, the City strongly urges the permit applicant to contact the easement holde) to s ure cessary approvals before starting such activity. Date 7- )S~7 Agent/Owner GREEN BAY WI 54313 - 0000 Telephone Number 920-465-0628 Address 3080 PAR CT To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.