Loading...
HomeMy WebLinkAbout0125951-Plumbing (added fixtures) e OSHKOSH ON THE WATER Job Address 3120 BAILEY CT CITY OF OSHKOSH No 125951 PLUMBING PERMIT - APPLICATION AND RECORD Owner MICHAEL R/TERESA L CULLUM Create Date 07/25/2007 Plan Contractor SBS PLUMBING LLC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Category 410 - Residential-Interior Shower Water Softner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest FlrlWst Sink Lndry Tray Clothes Wshr Exam Sink Catch Basin Disposal Bidet Sculry Sink Wash Ftn Dishwasher Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Install L T with work under permit #124080. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1342950900 Valuation Issued By $250.00 $0.00 $7.00 0 Permit Voided I Date 07/25/2007 Plan Approval Permit Fees In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 4635 RED FOX RD Agent/Owner OSHKOSH WI 54904 - 7784 Telephone Number 920-410-5933 Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.